Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hole-opening-free method for basement shear wall formwork
The invention relates to the technical field of constructional engineering, in particular to a basement shear wall formwork trepanning-free method which comprises a batten, a whole plate, a non-whole plate, a steel pipe secondary keel, a steel pipe main keel, an opposite-pull screw and a supporting rod, the steel pipe secondary keel and the steel pipe main keel are perpendicularly arranged, and a screw hole used for being connected with the opposite-pull screw in an inserted mode is formed in the batten. According to the method, the distance between the vertical steel pipe keels is reasonably set, the number of the transverse main keels is reduced, the distance between the vertical bolts is adjusted, battens are arranged between the whole plates, and screw holes are formed in the battens or non-whole plates, so that the whole plates do not need to be holed; the rigidity and stability of a supporting system are guaranteed, the whole formwork is not provided with holes, the turnover utilization rate of the formwork is increased, materials are saved, wood loss is reduced, energy is saved, the environment is protected, and the development strategy of green construction is met.
本发明涉及建筑工程技术领域,具体为一种地下室剪力墙模板免开孔的方法,包括板条、整板、非整板、钢管次龙骨、钢管主龙骨、对拉螺杆、撑棍,钢管次龙骨和钢管主龙骨垂直设置,板条上开设有用于插接对拉螺杆的螺杆孔。本发明通过合理设置竖向钢管龙骨的间距,减少横向主龙骨的数量,调整竖向螺栓的间距,在整板之间设置板条,将螺杆孔设置在板条或非整板上,从而实现了整板免开孔,本发明方法利用钢管加固体系为依托,次龙骨及背楞全部使用钢材,保证了支撑体系的刚度及稳定性,且整块模板不开孔,增加模板的周转使用率,节约了材料,减少了木材损耗,进而节能环保,符合绿色施工的发展战略。
Hole-opening-free method for basement shear wall formwork
The invention relates to the technical field of constructional engineering, in particular to a basement shear wall formwork trepanning-free method which comprises a batten, a whole plate, a non-whole plate, a steel pipe secondary keel, a steel pipe main keel, an opposite-pull screw and a supporting rod, the steel pipe secondary keel and the steel pipe main keel are perpendicularly arranged, and a screw hole used for being connected with the opposite-pull screw in an inserted mode is formed in the batten. According to the method, the distance between the vertical steel pipe keels is reasonably set, the number of the transverse main keels is reduced, the distance between the vertical bolts is adjusted, battens are arranged between the whole plates, and screw holes are formed in the battens or non-whole plates, so that the whole plates do not need to be holed; the rigidity and stability of a supporting system are guaranteed, the whole formwork is not provided with holes, the turnover utilization rate of the formwork is increased, materials are saved, wood loss is reduced, energy is saved, the environment is protected, and the development strategy of green construction is met.
本发明涉及建筑工程技术领域,具体为一种地下室剪力墙模板免开孔的方法,包括板条、整板、非整板、钢管次龙骨、钢管主龙骨、对拉螺杆、撑棍,钢管次龙骨和钢管主龙骨垂直设置,板条上开设有用于插接对拉螺杆的螺杆孔。本发明通过合理设置竖向钢管龙骨的间距,减少横向主龙骨的数量,调整竖向螺栓的间距,在整板之间设置板条,将螺杆孔设置在板条或非整板上,从而实现了整板免开孔,本发明方法利用钢管加固体系为依托,次龙骨及背楞全部使用钢材,保证了支撑体系的刚度及稳定性,且整块模板不开孔,增加模板的周转使用率,节约了材料,减少了木材损耗,进而节能环保,符合绿色施工的发展战略。
Hole-opening-free method for basement shear wall formwork
一种地下室剪力墙模板免开孔的方法
WANG XUETING (Autor:in) / WEI HUA (Autor:in) / MA NING (Autor:in) / HUANG ZHONGFU (Autor:in) / GUAN JIANYUN (Autor:in) / ZHANG CUNYING (Autor:in) / DONG ZHONGSHAN (Autor:in) / SHEN JIANSONG (Autor:in) / ZHANG YANHUA (Autor:in) / ZHANG YUANLI (Autor:in)
13.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Hole-opening-free construction method for whole plate formwork of shear wall
Europäisches Patentamt | 2024
|Shear wall formwork hole-free reinforcing structure and construction process
Europäisches Patentamt | 2020
|Basement outer wall unilateral formwork reinforcing construction method
Europäisches Patentamt | 2024
|Basement outer wall unilateral formwork supporting system
Europäisches Patentamt | 2023
|