Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method and structure for filling reservoir roadbed with silty mudstone filler
The invention discloses a method and a structure for filling a reservoir roadbed with silty mudstone filler, the structure comprises a fill body with unweathered silty mudstone as main filler, a first inverted filter and a second inverted filter are laid on the outer side of the slope of the fill body, the first inverted filter is located on the outer side of the second inverted filter, and the second inverted filter is located on the outer side of the first inverted filter. A water facing side dry rubble slope protection layer is arranged on the outer wall of the first inverted filter layer, and a filling slope toe protection wall is arranged at the slope bottom; the silty mudstone serves as the filler, good economical efficiency is achieved, collapse and sliding of the immersed slope can be effectively avoided, piping damage of the slope can be effectively prevented, and the beneficial effects of being high in construction speed, high in safety and high in practicability are achieved.
本发明公开了一种粉砂质泥岩填料填筑水库路基的方法及其结构,该结构包括由未风化的粉砂质泥岩为主要填料的填方体,在填方体坡面外侧铺设第一反滤层和第二反滤层,所述第一反滤层位于第二反滤层的外侧,在第一反滤层的外壁设有迎水侧干砌块石护坡层,在坡底设有填方坡脚护脚墙;本发明以粉砂质泥岩作为填料,具有较好的经济性,同时可有效避免浸水边坡的坍塌和滑动,可有效防止边坡管涌破坏,具有施工速度快,安全性高,实用性强的优点。
Method and structure for filling reservoir roadbed with silty mudstone filler
The invention discloses a method and a structure for filling a reservoir roadbed with silty mudstone filler, the structure comprises a fill body with unweathered silty mudstone as main filler, a first inverted filter and a second inverted filter are laid on the outer side of the slope of the fill body, the first inverted filter is located on the outer side of the second inverted filter, and the second inverted filter is located on the outer side of the first inverted filter. A water facing side dry rubble slope protection layer is arranged on the outer wall of the first inverted filter layer, and a filling slope toe protection wall is arranged at the slope bottom; the silty mudstone serves as the filler, good economical efficiency is achieved, collapse and sliding of the immersed slope can be effectively avoided, piping damage of the slope can be effectively prevented, and the beneficial effects of being high in construction speed, high in safety and high in practicability are achieved.
本发明公开了一种粉砂质泥岩填料填筑水库路基的方法及其结构,该结构包括由未风化的粉砂质泥岩为主要填料的填方体,在填方体坡面外侧铺设第一反滤层和第二反滤层,所述第一反滤层位于第二反滤层的外侧,在第一反滤层的外壁设有迎水侧干砌块石护坡层,在坡底设有填方坡脚护脚墙;本发明以粉砂质泥岩作为填料,具有较好的经济性,同时可有效避免浸水边坡的坍塌和滑动,可有效防止边坡管涌破坏,具有施工速度快,安全性高,实用性强的优点。
Method and structure for filling reservoir roadbed with silty mudstone filler
一种粉砂质泥岩填料填筑水库路基的方法及其结构
LIU PIN (Autor:in) / XU YUANHUA (Autor:in) / LONG WEI (Autor:in) / TENG ZIMENG (Autor:in) / LIU HUAN (Autor:in) / LIU CHANGWEI (Autor:in)
23.12.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2024
|Carbonaceous mudstone roadbed filling construction method and construction device
Europäisches Patentamt | 2023
|Carbonaceous mudstone geological area roadbed filling improvement and construction method
Europäisches Patentamt | 2024
|Mudstone filled roadbed structure and construction method thereof
Europäisches Patentamt | 2016
|Mudstone lateral expansive force tester and mudstone roadbed deformation calculation method
Europäisches Patentamt | 2024
|