Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a building foundation pit drainage system which comprises a plurality of open ditches dug in the inner bottom wall of a foundation pit and a water collecting well, a treatment box corresponding to the water collecting well is arranged on the ground, a water inlet pipe is arranged in the water collecting well, the water inlet pipe is fixedly communicated with the corresponding treatment box, and a water pump is installed on the water inlet pipe. A slow flow box is fixedly connected to the inner bottom wall of the treatment box, the upper surface of the slow flow box is a slow flow face, a settling tank is defined between the outer side wall of the slow flow box and the inner side wall of the treatment box, a water outlet pipe is further fixedly communicated with the treatment box and located between the water inlet pipe and the slow flow face, and a sieve plate is arranged in the treatment box. The sieve plate is located between the water inlet pipe and the water outlet pipe. The method has the effect of reducing adverse effects on the external environment.
本申请涉及一种建筑基坑排水系统,包括基坑内底壁上挖设的多个明沟以及集水井,地面上设置有与集水井对应设置的处理箱,集水井中设有一个进水管,进水管与对应的处理箱固定连通,进水管上安装有水泵,处理箱的内底壁上固定连接有一个缓流箱,缓流箱的上表面为缓流面,缓流箱的外侧壁与处理箱的内侧壁之间围成沉降槽,处理箱上还固定连通有一个出水管,出水管位于进水管与缓流面之间,处理箱内设有一个筛板,筛板位于进水管与出水管之间。本申请具有减少对外界环境造成不利影响的效果。
The invention relates to a building foundation pit drainage system which comprises a plurality of open ditches dug in the inner bottom wall of a foundation pit and a water collecting well, a treatment box corresponding to the water collecting well is arranged on the ground, a water inlet pipe is arranged in the water collecting well, the water inlet pipe is fixedly communicated with the corresponding treatment box, and a water pump is installed on the water inlet pipe. A slow flow box is fixedly connected to the inner bottom wall of the treatment box, the upper surface of the slow flow box is a slow flow face, a settling tank is defined between the outer side wall of the slow flow box and the inner side wall of the treatment box, a water outlet pipe is further fixedly communicated with the treatment box and located between the water inlet pipe and the slow flow face, and a sieve plate is arranged in the treatment box. The sieve plate is located between the water inlet pipe and the water outlet pipe. The method has the effect of reducing adverse effects on the external environment.
本申请涉及一种建筑基坑排水系统,包括基坑内底壁上挖设的多个明沟以及集水井,地面上设置有与集水井对应设置的处理箱,集水井中设有一个进水管,进水管与对应的处理箱固定连通,进水管上安装有水泵,处理箱的内底壁上固定连接有一个缓流箱,缓流箱的上表面为缓流面,缓流箱的外侧壁与处理箱的内侧壁之间围成沉降槽,处理箱上还固定连通有一个出水管,出水管位于进水管与缓流面之间,处理箱内设有一个筛板,筛板位于进水管与出水管之间。本申请具有减少对外界环境造成不利影响的效果。
Building foundation pit drainage system
一种建筑基坑排水系统
JIAO ZHICHAO (Autor:in)
30.12.2022
Patent
Elektronische Ressource
Chinesisch
Building foundation pit drainage system and drainage structure thereof
Europäisches Patentamt | 2022
|