Automatic mounting device and method for concrete socket pipe
The automatic mounting device comprises a construction vehicle and a pipeline consignment vehicle, a comprehensive power box is arranged in a carriage of the construction vehicle, a pipeline hoisting mechanism is arranged at the top of the carriage, a construction opening is formed in the front side of a bottom plate of the carriage, a pipeline butt joint mechanism is arranged on the front side of the carriage, and the pipeline butt joint mechanism corresponds to the construction opening in position. An operation table is arranged on the rear side of the compartment bottom plate, detachable step ladders are arranged at the positions corresponding to the operation table and a construction opening respectively, the comprehensive power box provides power support for the pipeline lifting mechanism and the pipeline butt joint mechanism, and the pipeline carrying vehicle carries concrete spigot and socket pipes to be installed and advances along with the construction vehicle. According to the invention, the automation degree of hoisting and mounting of the concrete socket pipe is improved, accurate positioning and all-directional protection are realized, and accurate butt joint of the concrete socket pipe is ensured.
本发明提出一种混凝土承插管的自动化安装装置及方法,包括施工车和管道托运车,施工车的车厢内设有综合动力箱,车厢顶部设有管道吊运机构,车厢底板前侧设有施工口,车厢前侧设有管道对接机构,与施工口的位置相对应,车厢底板后侧设有操作台,对应操作台及施工口的位置分别设有可拆装的步梯,综合动力箱为管道吊运机构及管道对接机构提供动力支持,管道托运车上运载待安装的混凝土承插管,跟随施工车行进,本发明提高混凝土承插管的吊运安装的自动化程度,精准定位,全方位防护,保证混凝土承插管的精准对接。
Automatic mounting device and method for concrete socket pipe
The automatic mounting device comprises a construction vehicle and a pipeline consignment vehicle, a comprehensive power box is arranged in a carriage of the construction vehicle, a pipeline hoisting mechanism is arranged at the top of the carriage, a construction opening is formed in the front side of a bottom plate of the carriage, a pipeline butt joint mechanism is arranged on the front side of the carriage, and the pipeline butt joint mechanism corresponds to the construction opening in position. An operation table is arranged on the rear side of the compartment bottom plate, detachable step ladders are arranged at the positions corresponding to the operation table and a construction opening respectively, the comprehensive power box provides power support for the pipeline lifting mechanism and the pipeline butt joint mechanism, and the pipeline carrying vehicle carries concrete spigot and socket pipes to be installed and advances along with the construction vehicle. According to the invention, the automation degree of hoisting and mounting of the concrete socket pipe is improved, accurate positioning and all-directional protection are realized, and accurate butt joint of the concrete socket pipe is ensured.
本发明提出一种混凝土承插管的自动化安装装置及方法,包括施工车和管道托运车,施工车的车厢内设有综合动力箱,车厢顶部设有管道吊运机构,车厢底板前侧设有施工口,车厢前侧设有管道对接机构,与施工口的位置相对应,车厢底板后侧设有操作台,对应操作台及施工口的位置分别设有可拆装的步梯,综合动力箱为管道吊运机构及管道对接机构提供动力支持,管道托运车上运载待安装的混凝土承插管,跟随施工车行进,本发明提高混凝土承插管的吊运安装的自动化程度,精准定位,全方位防护,保证混凝土承插管的精准对接。
Automatic mounting device and method for concrete socket pipe
一种混凝土承插管的自动化安装装置及方法
CHEN JIN (Autor:in) / CHEN LONG (Autor:in) / ZHANG AN (Autor:in) / LIU DEFENG (Autor:in) / CHANG JIQUAN (Autor:in)
30.12.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Reinforced concrete socket pipe mounting device and process
Europäisches Patentamt | 2023
|Construction method of prefabricated concrete socket rainwater pipe
Europäisches Patentamt | 2022
|Deep foundation trench large-diameter socket type concrete pipeline mounting method