Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel structure landscape corridor and construction method thereof
The invention relates to a steel structure landscape corridor and a construction method thereof. The steel structure landscape corridor comprises a supporting frame, the supporting frame comprises supporting columns, a main beam and a secondary beam, the two ends of the main beam are fixed to the two adjacent supporting columns respectively, the two ends of the secondary beam are fixed to the two supporting columns respectively, and a main connecting plate and a secondary connecting plate are fixedly arranged on the supporting columns; bolt holes used for installing bolts are formed in the main connecting plate and the secondary connecting plate, bolt holes matched with the bolt holes in the main connecting plate are formed in the end of the main beam, bolt holes matched with the bolt holes in the secondary connecting plate are formed in the end of the secondary beam, and the end of the main beam is fixedly connected with the bolts of the main connecting plate. And the end parts of the secondary beams are fixedly connected with the secondary connecting plates through bolts. When the steel structure landscape corridor is constructed, the two ends of the main beam are fixed to the supporting columns through the main connecting plate bolts, the two ends of the secondary beam are fixed to the supporting columns through the secondary connecting plate bolts, and compared with a welding fixing mode, the construction efficiency of the landscape corridor can be improved.
本申请涉及一种钢结构景观廊道及其施工方法。钢结构景观廊道包括支撑框架,支撑框架包括支撑柱、主梁和次梁,主梁的两端分别固定在相邻两支撑柱上,次梁的两端分别固定在两支撑柱上,支撑柱上固定设置有主连接板和次连接板,主连接板和次连接板上均开设有用于安装螺栓的螺栓孔,主梁的端部开设有与主连接板上螺栓孔配合的螺栓孔,次梁的端部开设有与次连接板上螺栓孔配合的螺栓孔,主梁的端部与主连接板螺栓固定连接,次梁的端部与次连接板螺栓固定连接。本申请的钢结构景观廊道在施工时,将主梁的两端通过主连接板螺栓固定在支撑柱上,将次梁的两端通过次连接板螺栓固定在支撑柱上,相较于焊接固定的方式能够提高景观廊道的施工效率。
Steel structure landscape corridor and construction method thereof
The invention relates to a steel structure landscape corridor and a construction method thereof. The steel structure landscape corridor comprises a supporting frame, the supporting frame comprises supporting columns, a main beam and a secondary beam, the two ends of the main beam are fixed to the two adjacent supporting columns respectively, the two ends of the secondary beam are fixed to the two supporting columns respectively, and a main connecting plate and a secondary connecting plate are fixedly arranged on the supporting columns; bolt holes used for installing bolts are formed in the main connecting plate and the secondary connecting plate, bolt holes matched with the bolt holes in the main connecting plate are formed in the end of the main beam, bolt holes matched with the bolt holes in the secondary connecting plate are formed in the end of the secondary beam, and the end of the main beam is fixedly connected with the bolts of the main connecting plate. And the end parts of the secondary beams are fixedly connected with the secondary connecting plates through bolts. When the steel structure landscape corridor is constructed, the two ends of the main beam are fixed to the supporting columns through the main connecting plate bolts, the two ends of the secondary beam are fixed to the supporting columns through the secondary connecting plate bolts, and compared with a welding fixing mode, the construction efficiency of the landscape corridor can be improved.
本申请涉及一种钢结构景观廊道及其施工方法。钢结构景观廊道包括支撑框架,支撑框架包括支撑柱、主梁和次梁,主梁的两端分别固定在相邻两支撑柱上,次梁的两端分别固定在两支撑柱上,支撑柱上固定设置有主连接板和次连接板,主连接板和次连接板上均开设有用于安装螺栓的螺栓孔,主梁的端部开设有与主连接板上螺栓孔配合的螺栓孔,次梁的端部开设有与次连接板上螺栓孔配合的螺栓孔,主梁的端部与主连接板螺栓固定连接,次梁的端部与次连接板螺栓固定连接。本申请的钢结构景观廊道在施工时,将主梁的两端通过主连接板螺栓固定在支撑柱上,将次梁的两端通过次连接板螺栓固定在支撑柱上,相较于焊接固定的方式能够提高景观廊道的施工效率。
Steel structure landscape corridor and construction method thereof
一种钢结构景观廊道及其施工方法
XUE WENCAN (Autor:in) / LYU ZHILIN (Autor:in) / HARA MANABU (Autor:in) / LI JIEYING (Autor:in) / LI MINHUA (Autor:in)
30.12.2022
Patent
Elektronische Ressource
Chinesisch
Steel structure corridor support and construction method thereof
Europäisches Patentamt | 2024
|Steel structure corridor support and construction method thereof
Europäisches Patentamt | 2024
|Steel corridor drainage ditch structure and construction method thereof
Europäisches Patentamt | 2023
|Steel corridor construction box type protection structure and construction method thereof
Europäisches Patentamt | 2024
|