Steel-concrete combined assembly type main transformer foundation and construction method thereof
The invention relates to a steel-concrete combined assembly type main transformer foundation and a construction method thereof, the steel-concrete combined assembly type main transformer foundation comprises a concrete cushion layer, a plurality of combined rafts and a plurality of combined buttresses, and the combined rafts are distributed on the concrete cushion layer in a matrix; the number of the combined buttresses is half of that of the combined rafts, each combined buttress corresponds to two adjacent combined rafts, the combined buttresses are located above the combined rafts, the combined rafts are connected into a whole through bolts, and the combined rafts and the combined buttresses are connected into a whole through bolts. The combined raft is prefabricated in a split type factory, the size is small, the transportation cost is reduced, and the transportation efficiency is improved; and meanwhile, modular installation is achieved, requirements of different main transformer devices are flexibly met, construction and installation are flexible, the problem that the workload of on-site wet operation caused by pouring is large is solved, the problem of environmental pollution caused by construction is relieved to a certain extent, construction procedures are reduced, the efficiency of on-site operation and the construction quality are improved, and the labor cost is greatly reduced.
本发明涉及一种钢混组合装配式主变压器基础及其施工方法,包括混凝土垫层、组合筏板和组合支墩,复数个组合筏板呈矩阵分布在混凝土垫层上;组合支墩的数量为组合筏板数量的一半,每个组合支墩分别与两个相邻的组合筏板相对应,组合支墩位于组合筏板的上方,组合筏板相互之间、组合筏板与组合支墩之间均通过螺栓连接形成一个整体。组合筏板采用分体式工厂预制,体积较小,减小运输成本、提升运输的效率;同时模块化安装,灵活适用于不同主变设备的需要,施工安装灵活,解决了浇筑引起的现场湿作业工作量大的问题,一定程度上缓解了施工所带来的环境污染问题,减少施工工序,提升了现场作业的效率和施工质量,大大减少人工成本。
Steel-concrete combined assembly type main transformer foundation and construction method thereof
The invention relates to a steel-concrete combined assembly type main transformer foundation and a construction method thereof, the steel-concrete combined assembly type main transformer foundation comprises a concrete cushion layer, a plurality of combined rafts and a plurality of combined buttresses, and the combined rafts are distributed on the concrete cushion layer in a matrix; the number of the combined buttresses is half of that of the combined rafts, each combined buttress corresponds to two adjacent combined rafts, the combined buttresses are located above the combined rafts, the combined rafts are connected into a whole through bolts, and the combined rafts and the combined buttresses are connected into a whole through bolts. The combined raft is prefabricated in a split type factory, the size is small, the transportation cost is reduced, and the transportation efficiency is improved; and meanwhile, modular installation is achieved, requirements of different main transformer devices are flexibly met, construction and installation are flexible, the problem that the workload of on-site wet operation caused by pouring is large is solved, the problem of environmental pollution caused by construction is relieved to a certain extent, construction procedures are reduced, the efficiency of on-site operation and the construction quality are improved, and the labor cost is greatly reduced.
本发明涉及一种钢混组合装配式主变压器基础及其施工方法,包括混凝土垫层、组合筏板和组合支墩,复数个组合筏板呈矩阵分布在混凝土垫层上;组合支墩的数量为组合筏板数量的一半,每个组合支墩分别与两个相邻的组合筏板相对应,组合支墩位于组合筏板的上方,组合筏板相互之间、组合筏板与组合支墩之间均通过螺栓连接形成一个整体。组合筏板采用分体式工厂预制,体积较小,减小运输成本、提升运输的效率;同时模块化安装,灵活适用于不同主变设备的需要,施工安装灵活,解决了浇筑引起的现场湿作业工作量大的问题,一定程度上缓解了施工所带来的环境污染问题,减少施工工序,提升了现场作业的效率和施工质量,大大减少人工成本。
Steel-concrete combined assembly type main transformer foundation and construction method thereof
一种钢混组合装配式主变压器基础及其施工方法
CHEN XILONG (Autor:in) / GAO XIAN (Autor:in) / HUANG DIANZU (Autor:in) / WANG CHUNLI (Autor:in) / CHEN XIAOMIN (Autor:in) / YAN YAN (Autor:in) / GUO WEI (Autor:in) / WANG PENGFEI (Autor:in)
03.01.2023
Patent
Elektronische Ressource
Chinesisch
Enveloping type main transformer foundation construction method
Europäisches Patentamt | 2024
|Main transformer cavity foundation construction method and main transformer cavity foundation
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Prefabricated steel concrete combined ring main unit foundation
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2016
|