Safe dismantling method for building machine
The invention discloses a safe dismantling method for a building machine, which comprises the following steps of: 1, before a construction task of the building machine is finished, performing hanging and fixing anchor point embedding on each frame body and a template on a building structure, (1) performing large template hanging point pre-embedding on the top of a roof layer, and (2) performing hanging and fixing anchor point embedding on the frame body on a first layer of the roof layer; secondly, before the building machine is dismantled, the large formwork and the inner side frame body are fixed to the corresponding anchor points through steel wire ropes, and after the large formwork and the inner side frame body are firmly fixed, connection between the large formwork and the top construction platform and connection between the inner side frame body and the top construction platform are dismantled; and the building machines are sequentially disassembled and manufactured from outside to inside and from top to bottom. The inner large formwork and the outer large formwork are fixed to the building wall through the hanging anchor points, the frame body is fixed to the building wall through the fixing anchor points, then the building machine is dismantled through the dismantling method from outside to inside and from top to bottom in sequence, and the dismantling mode is safe and reliable.
本发明公开了一种造楼机安全拆除方法,第一步:在造楼机施工任务完成前,在建筑结构进行各架体、模板吊挂固定锚点埋件,(1)在屋面层顶部进行大模板吊点预埋,(2)在屋面层‑1层进行架体吊挂固定锚点;第二步:在造楼机拆除前,先将大模板、内侧架体采用钢丝绳固定在对应的锚点上,在大模板、内侧架体固定牢固后,拆除大模板、内侧架体与顶部施工平台的连接;由外至内、由上至下依次拆造楼机。通过将内外大模板通过吊挂锚点、架体通过固定锚点固定在建筑墙体上,然后采用由外至内、由上至下的顺序拆除法拆除造楼机,拆除方式安全可靠。
Safe dismantling method for building machine
The invention discloses a safe dismantling method for a building machine, which comprises the following steps of: 1, before a construction task of the building machine is finished, performing hanging and fixing anchor point embedding on each frame body and a template on a building structure, (1) performing large template hanging point pre-embedding on the top of a roof layer, and (2) performing hanging and fixing anchor point embedding on the frame body on a first layer of the roof layer; secondly, before the building machine is dismantled, the large formwork and the inner side frame body are fixed to the corresponding anchor points through steel wire ropes, and after the large formwork and the inner side frame body are firmly fixed, connection between the large formwork and the top construction platform and connection between the inner side frame body and the top construction platform are dismantled; and the building machines are sequentially disassembled and manufactured from outside to inside and from top to bottom. The inner large formwork and the outer large formwork are fixed to the building wall through the hanging anchor points, the frame body is fixed to the building wall through the fixing anchor points, then the building machine is dismantled through the dismantling method from outside to inside and from top to bottom in sequence, and the dismantling mode is safe and reliable.
本发明公开了一种造楼机安全拆除方法,第一步:在造楼机施工任务完成前,在建筑结构进行各架体、模板吊挂固定锚点埋件,(1)在屋面层顶部进行大模板吊点预埋,(2)在屋面层‑1层进行架体吊挂固定锚点;第二步:在造楼机拆除前,先将大模板、内侧架体采用钢丝绳固定在对应的锚点上,在大模板、内侧架体固定牢固后,拆除大模板、内侧架体与顶部施工平台的连接;由外至内、由上至下依次拆造楼机。通过将内外大模板通过吊挂锚点、架体通过固定锚点固定在建筑墙体上,然后采用由外至内、由上至下的顺序拆除法拆除造楼机,拆除方式安全可靠。
Safe dismantling method for building machine
一种造楼机安全拆除方法
CHEN PINGXIA (Autor:in) / WANG BANGPING (Autor:in) / ZHANG MINGYANG (Autor:in) / LI ZHI (Autor:in) / CHEN QIANGUANG (Autor:in)
17.01.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Semi-fabricated safe early-dismantling building template structure
Europäisches Patentamt | 2023
|Low-noise and dust-free building dismantling cutting machine and building dismantling method
Europäisches Patentamt | 2024
|Building facade dismantling device and dismantling method
Europäisches Patentamt | 2024
|Building dismantling machine and application method thereof
Europäisches Patentamt | 2023
|