Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Large-volume concrete formwork pull rod hole grout stopping method
The invention discloses a large-volume concrete formwork pull rod grout stopping method, and relates to the technical field of concrete construction. The mass concrete formwork pull rod grout stopping method comprises the steps of formwork erecting, pull rod installing, grout stopping cushion block installing, concrete pouring, concrete curing, formwork and grout stopping cushion block removing and concrete repairing. By means of the large-volume concrete formwork pull rod grout stopping method, formwork pull rod holes can be effectively plugged, grout leakage is prevented, meanwhile, a pull rod protection layer can be reserved, the exposed part of the pull rod is protected, the exposed end of the pull rod is prevented from being rusted, and the concrete appearance quality can be improved; the grout stopping method is simple in construction, the appearance treatment time of the concrete after formwork removal can be shortened, and the construction efficiency is improved.
本发明公开了一种大体积混凝土模板拉杆止浆方法,涉及混凝土施工技术领域。所述大体积混凝土模板拉杆止浆方法包括:支立模板,安装拉杆,安装止浆垫块,浇筑混凝土,养护混凝土,拆除模板及止浆垫块,修补混凝土。采用此大体积混凝土模板拉杆止浆方法可对模板拉杆孔有效封堵,防止浆液渗漏,同时还可预留拉杆保护层,保护拉杆的外露部分,防止拉杆外露端锈蚀,还可提高混凝土外观质量;此止浆方法施工简单,可减少拆模后混凝土的外观处理时间,提高施工效率。
Large-volume concrete formwork pull rod hole grout stopping method
The invention discloses a large-volume concrete formwork pull rod grout stopping method, and relates to the technical field of concrete construction. The mass concrete formwork pull rod grout stopping method comprises the steps of formwork erecting, pull rod installing, grout stopping cushion block installing, concrete pouring, concrete curing, formwork and grout stopping cushion block removing and concrete repairing. By means of the large-volume concrete formwork pull rod grout stopping method, formwork pull rod holes can be effectively plugged, grout leakage is prevented, meanwhile, a pull rod protection layer can be reserved, the exposed part of the pull rod is protected, the exposed end of the pull rod is prevented from being rusted, and the concrete appearance quality can be improved; the grout stopping method is simple in construction, the appearance treatment time of the concrete after formwork removal can be shortened, and the construction efficiency is improved.
本发明公开了一种大体积混凝土模板拉杆止浆方法,涉及混凝土施工技术领域。所述大体积混凝土模板拉杆止浆方法包括:支立模板,安装拉杆,安装止浆垫块,浇筑混凝土,养护混凝土,拆除模板及止浆垫块,修补混凝土。采用此大体积混凝土模板拉杆止浆方法可对模板拉杆孔有效封堵,防止浆液渗漏,同时还可预留拉杆保护层,保护拉杆的外露部分,防止拉杆外露端锈蚀,还可提高混凝土外观质量;此止浆方法施工简单,可减少拆模后混凝土的外观处理时间,提高施工效率。
Large-volume concrete formwork pull rod hole grout stopping method
一种大体积混凝土模板拉杆孔止浆方法
YANG XIAOXIAO (Autor:in) / ZHANG YANG (Autor:in) / WAN HU (Autor:in) / LIANG MINGLIANG (Autor:in) / FU YEHUANG (Autor:in) / FAN ZHIHONG (Autor:in)
20.01.2023
Patent
Elektronische Ressource
Chinesisch
FORMWORK FOR GROUT INJECTION AND GROUT INJECTION METHOD
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|Prestressed concrete beam grout stopping device and method
Europäisches Patentamt | 2022
|