Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pipe truss type roof structure form double-splicing skip-warehouse type construction method
The invention relates to the technical field of steel structure construction in the metallurgical industry, in particular to a double-splicing skip type construction method of a pipe truss type roof structure form. Comprising the steps that 1, a roof truss system is assembled on the ground; step 2, hoisting a first group of roof truss system; step 3, hoisting a second group of roof truss system; 4, filling and hoisting the first group of roof truss system components and the second group of roof truss system components; 5, repeating the steps 1 to 4; and 6, finishing the hoisting of the roof system. According to the pipe truss type roof structure type double-splicing skip-warehouse-method installation method, the mode of ground modular splicing and skip-warehouse-method aerial hoisting is adopted, in this way, the installation period can be greatly shortened, high-altitude operation construction is reduced, the construction quality is effectively improved, and the high-altitude operation safety risk is reduced.
本发明涉及冶金工业的钢结构建造技术领域,具体是一种管桁架式屋面结构形式的双拼跳仓式建造方法;包括步骤1、屋面桁架系统地面拼装;步骤2、第一组屋面桁架系统吊装;步骤3、第二组屋面桁架系统吊装;步骤4、第一组与第二组屋面桁架系统构件填充吊装、步骤5、重复步骤1到4、步骤6、屋面系统吊装完成。本发明所提出的管桁架式屋面结构形式双拼跳仓法安装方法,采用地面模块化拼装、跳仓法空中吊装的方式进行,如此可以极大的缩短安装工期,减少高空作业施工,有效的提高了施工质量,降低了高空作业安全风险。
Pipe truss type roof structure form double-splicing skip-warehouse type construction method
The invention relates to the technical field of steel structure construction in the metallurgical industry, in particular to a double-splicing skip type construction method of a pipe truss type roof structure form. Comprising the steps that 1, a roof truss system is assembled on the ground; step 2, hoisting a first group of roof truss system; step 3, hoisting a second group of roof truss system; 4, filling and hoisting the first group of roof truss system components and the second group of roof truss system components; 5, repeating the steps 1 to 4; and 6, finishing the hoisting of the roof system. According to the pipe truss type roof structure type double-splicing skip-warehouse-method installation method, the mode of ground modular splicing and skip-warehouse-method aerial hoisting is adopted, in this way, the installation period can be greatly shortened, high-altitude operation construction is reduced, the construction quality is effectively improved, and the high-altitude operation safety risk is reduced.
本发明涉及冶金工业的钢结构建造技术领域,具体是一种管桁架式屋面结构形式的双拼跳仓式建造方法;包括步骤1、屋面桁架系统地面拼装;步骤2、第一组屋面桁架系统吊装;步骤3、第二组屋面桁架系统吊装;步骤4、第一组与第二组屋面桁架系统构件填充吊装、步骤5、重复步骤1到4、步骤6、屋面系统吊装完成。本发明所提出的管桁架式屋面结构形式双拼跳仓法安装方法,采用地面模块化拼装、跳仓法空中吊装的方式进行,如此可以极大的缩短安装工期,减少高空作业施工,有效的提高了施工质量,降低了高空作业安全风险。
Pipe truss type roof structure form double-splicing skip-warehouse type construction method
一种管桁架式屋面结构形式双拼跳仓式建造方法
WANG MIN (Autor:in) / ZHANG XIAOFENG (Autor:in) / WANG BO (Autor:in) / YUAN XIAO (Autor:in) / GUAN CONGCONG (Autor:in) / ZHANG CHAOHUI (Autor:in)
20.01.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Truss structure double-splicing type adjustable bridge anti-overturning construction method
Europäisches Patentamt | 2023
|Light steel beam type truss double-splicing structure
Europäisches Patentamt | 2022
|Large-span pipe truss roof truss assembling construction method
Europäisches Patentamt | 2021
|Large multi-layer roof pipe truss construction method
Europäisches Patentamt | 2023
|