Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated concrete shear wall structure
The fabricated concrete shear wall structure comprises a plurality of first connecting pieces and a plurality of second connecting pieces, the first connecting pieces and the second connecting pieces are used for being embedded into the fabricated surfaces of two adjacent shear walls correspondingly, and third connecting pieces are jointly arranged on the first connecting pieces and the second connecting pieces; the first connecting piece and the second connecting piece are clamped through the third connecting piece in the direction perpendicular to the maximum-area outer wall of the shear wall, and the third connecting piece is prevented from being disengaged from contact to lock the first connecting piece and the second connecting piece through concrete pouring and filling; the assembly connection between the shear walls is ensured to have qualified shear resistance and shock resistance, the problem that the safety of a house is influenced by unstable connection caused by welding connection is avoided, no external equipment is needed, the dependence on the equipment is reduced, the working process is reduced, and the assembly efficiency is improved.
本发明公开了一种装配式混凝土剪力墙结构,包括用于分别内嵌至相邻两个剪力墙上装配面的多个第一连接件和多个第二连接件,所述第一连接件和所述第二连接件上共同设置有第三连接件,本发明通过第三连接件沿垂直于剪力墙最大面积外壁的方向卡接第一连接件和第二连接件,并通过混凝土浇灌填充以限制第三连接件脱离接触对第一连接件和第二连接件的锁定,保证了剪力墙之间的装配连接以具有合格的抗剪能力和抗震能力,且避免了通过焊接连接造成连接不稳定影响房屋安全的问题,并且不需要外部设备介入,降低了对设备的依赖并减少了工作流程,提高了装配效率。
Fabricated concrete shear wall structure
The fabricated concrete shear wall structure comprises a plurality of first connecting pieces and a plurality of second connecting pieces, the first connecting pieces and the second connecting pieces are used for being embedded into the fabricated surfaces of two adjacent shear walls correspondingly, and third connecting pieces are jointly arranged on the first connecting pieces and the second connecting pieces; the first connecting piece and the second connecting piece are clamped through the third connecting piece in the direction perpendicular to the maximum-area outer wall of the shear wall, and the third connecting piece is prevented from being disengaged from contact to lock the first connecting piece and the second connecting piece through concrete pouring and filling; the assembly connection between the shear walls is ensured to have qualified shear resistance and shock resistance, the problem that the safety of a house is influenced by unstable connection caused by welding connection is avoided, no external equipment is needed, the dependence on the equipment is reduced, the working process is reduced, and the assembly efficiency is improved.
本发明公开了一种装配式混凝土剪力墙结构,包括用于分别内嵌至相邻两个剪力墙上装配面的多个第一连接件和多个第二连接件,所述第一连接件和所述第二连接件上共同设置有第三连接件,本发明通过第三连接件沿垂直于剪力墙最大面积外壁的方向卡接第一连接件和第二连接件,并通过混凝土浇灌填充以限制第三连接件脱离接触对第一连接件和第二连接件的锁定,保证了剪力墙之间的装配连接以具有合格的抗剪能力和抗震能力,且避免了通过焊接连接造成连接不稳定影响房屋安全的问题,并且不需要外部设备介入,降低了对设备的依赖并减少了工作流程,提高了装配效率。
Fabricated concrete shear wall structure
一种装配式混凝土剪力墙结构
HE XUNLIN (Autor:in) / KE SHANXIN (Autor:in) / WANG LIGUO (Autor:in) / WANG YUANYUAN (Autor:in) / CHEN SHUO (Autor:in)
24.01.2023
Patent
Elektronische Ressource
Chinesisch
Fabricated integral lightly reinforced concrete shear wall structure
Europäisches Patentamt | 2021
|Fabricated profile steel confined concrete shear wall structure
Europäisches Patentamt | 2021
|Fabricated concrete shear wall local prestress connecting structure
Europäisches Patentamt | 2020
|