Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building construction site pay-off rack for civil engineering
The invention provides a building construction site pay-off rack for civil engineering, and solves the problems that a take-up and pay-off device can only conduct one pay-off construction at the same time during pay-off, and the efficiency is low. The take-up and pay-off device comprises a bottom plate, a front first bearing supporting frame and a rear first bearing supporting frame are fixedly arranged on the bottom plate, a mounting shaft is rotationally arranged on the two first bearing supporting frames, at least two take-up and pay-off devices are arranged on the mounting shaft front and back at intervals, and a rope is wound around the take-up and pay-off devices; a first rotary driving device in transmission connection with one end of the mounting shaft is arranged on the bottom plate; a movable rope guide which can be taken down is arranged on the bottom plate, and the movable rope guide is used for being placed at a paying-off starting point position so as to guide the direction of a rope entering a paying-off area; an end positioner capable of being taken down is arranged on the bottom plate, the end positioner is detachably connected with the end of the rope, and the end positioner is used for pulling the rope and fixing the end of the rope at the paying-off final position.
本发明提供了用于土木工程的房建施工现场放线架,解决了收放线装置在放线时只能同时进行一个放线施工,效率较低的问题。本发明包括底板,底板上固定设有前后两个第一轴承支撑架,两个第一轴承支撑架上转动设有一根安装轴,安装轴上前后间隔设置有至少两个收放线装置,收放线装置上绕设有线绳;底板上设有与安装轴的一端传动连接的第一旋转驱动装置;底板上设有能够取下的移动式导绳器,移动式导绳器用以放置在放线起点位置以对进入放线区域的线绳的方向进行引导;底板上设有能够取下的端头定位器,端头定位器与线绳的端部可拆连接,端头定位器用以牵引线绳并将线绳的端部固定在放线终点位置。
Building construction site pay-off rack for civil engineering
The invention provides a building construction site pay-off rack for civil engineering, and solves the problems that a take-up and pay-off device can only conduct one pay-off construction at the same time during pay-off, and the efficiency is low. The take-up and pay-off device comprises a bottom plate, a front first bearing supporting frame and a rear first bearing supporting frame are fixedly arranged on the bottom plate, a mounting shaft is rotationally arranged on the two first bearing supporting frames, at least two take-up and pay-off devices are arranged on the mounting shaft front and back at intervals, and a rope is wound around the take-up and pay-off devices; a first rotary driving device in transmission connection with one end of the mounting shaft is arranged on the bottom plate; a movable rope guide which can be taken down is arranged on the bottom plate, and the movable rope guide is used for being placed at a paying-off starting point position so as to guide the direction of a rope entering a paying-off area; an end positioner capable of being taken down is arranged on the bottom plate, the end positioner is detachably connected with the end of the rope, and the end positioner is used for pulling the rope and fixing the end of the rope at the paying-off final position.
本发明提供了用于土木工程的房建施工现场放线架,解决了收放线装置在放线时只能同时进行一个放线施工,效率较低的问题。本发明包括底板,底板上固定设有前后两个第一轴承支撑架,两个第一轴承支撑架上转动设有一根安装轴,安装轴上前后间隔设置有至少两个收放线装置,收放线装置上绕设有线绳;底板上设有与安装轴的一端传动连接的第一旋转驱动装置;底板上设有能够取下的移动式导绳器,移动式导绳器用以放置在放线起点位置以对进入放线区域的线绳的方向进行引导;底板上设有能够取下的端头定位器,端头定位器与线绳的端部可拆连接,端头定位器用以牵引线绳并将线绳的端部固定在放线终点位置。
Building construction site pay-off rack for civil engineering
用于土木工程的房建施工现场放线架
WANG QINGYONG (Autor:in) / ZHAO HONGXU (Autor:in) / LI SHUAIKANG (Autor:in) / QIAN YUJIA (Autor:in) / YANG QINGJIE (Autor:in) / ZHANG MENGXUAN (Autor:in) / LYU PENGFEI (Autor:in)
31.01.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction site discharging device for building civil engineering
Europäisches Patentamt | 2022
|