Cavern and gate design method combining construction diversion and flood discharge adjustment
The invention discloses a construction diversion and flood discharge adjustment combined cavern and gate design method which comprises the steps that S100, a first gate and a second gate are disassembled, the disassembled first gate can move between a first position and a second position, and when the first gate is located at the first position, the second gate is located at the second position; the bottom of the first gate abuts against the top of the second gate to block the diversion tunnel, and when the first gate is located at the second position, the first gate and the second gate are separated to form a fluid channel for liquid circulation; and S200, the second gate is fixed. It should be understood that when the diversion tunnel is changed into the discharge tunnel, the first gate is more used as a service valve. And when the first gate descends to the first position, the diversion tunnel is blocked. And then the first valve located at the tail end of the diversion tunnel is opened, so that water located between the first gate and the first valve is drained, and maintenance personnel can enter the diversion tunnel for maintenance and detection.
本发明公开了一种施工导流与泄洪调节相结合的洞室与闸门设计方法,包括步骤S100、将第一闸门与第二闸门拆开,且拆开后的第一闸门能够在第一位置以及第二位置之间移动,当第一闸门处于第一位置时,第一闸门的底部抵接于第二闸门的顶部以封堵导流洞,当第一闸门处于第二位置时,第一闸门与第二闸门分离以形成供液体流通的流体通道;以及步骤S200、固定第二闸门。应理解的是,当导流洞变为泄放洞后,第一闸门更多是承担检修阀的作用。当第一闸门下降至第一位置时,封堵了导流洞。然后让处于导流洞的末端的第一阀门打开,使得位于第一闸门以及第一阀门之间的水排干,那么维修人员就可以进入到导流洞中进行维修检测。
Cavern and gate design method combining construction diversion and flood discharge adjustment
The invention discloses a construction diversion and flood discharge adjustment combined cavern and gate design method which comprises the steps that S100, a first gate and a second gate are disassembled, the disassembled first gate can move between a first position and a second position, and when the first gate is located at the first position, the second gate is located at the second position; the bottom of the first gate abuts against the top of the second gate to block the diversion tunnel, and when the first gate is located at the second position, the first gate and the second gate are separated to form a fluid channel for liquid circulation; and S200, the second gate is fixed. It should be understood that when the diversion tunnel is changed into the discharge tunnel, the first gate is more used as a service valve. And when the first gate descends to the first position, the diversion tunnel is blocked. And then the first valve located at the tail end of the diversion tunnel is opened, so that water located between the first gate and the first valve is drained, and maintenance personnel can enter the diversion tunnel for maintenance and detection.
本发明公开了一种施工导流与泄洪调节相结合的洞室与闸门设计方法,包括步骤S100、将第一闸门与第二闸门拆开,且拆开后的第一闸门能够在第一位置以及第二位置之间移动,当第一闸门处于第一位置时,第一闸门的底部抵接于第二闸门的顶部以封堵导流洞,当第一闸门处于第二位置时,第一闸门与第二闸门分离以形成供液体流通的流体通道;以及步骤S200、固定第二闸门。应理解的是,当导流洞变为泄放洞后,第一闸门更多是承担检修阀的作用。当第一闸门下降至第一位置时,封堵了导流洞。然后让处于导流洞的末端的第一阀门打开,使得位于第一闸门以及第一阀门之间的水排干,那么维修人员就可以进入到导流洞中进行维修检测。
Cavern and gate design method combining construction diversion and flood discharge adjustment
施工导流与泄洪调节相结合的洞室与闸门设计方法
LIU XUESHAN (Autor:in) / ZHANG PENG (Autor:in) / YANG FENG (Autor:in) / LI YULIN (Autor:in) / LIN KAI (Autor:in) / PENG QIAN (Autor:in) / GUO KAI (Autor:in) / LIU TAO (Autor:in) / YANG XIAOLONG (Autor:in) / LEI XINGCHUN (Autor:in)
03.02.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Construction method for diversion of flood discharge channel
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Intelligent gate with rain and flood diversion function
Europäisches Patentamt | 2023
|Intelligent gate with rain and flood diversion function
Europäisches Patentamt | 2020
|