The invention discloses a rock geology foundation reverse formwork structure and a construction method thereof.The structure comprises a plurality of single-side formworks arranged in pairs and arranged in a sinking pit formed by excavation in rock geology, and a cushion layer supported on the single-side formworks is poured at the bottom of the sinking pit; a pouring space is defined by the single-side formwork and the pit wall of the sinking pit. The reinforcing assemblies are mounted on the opposite sides of the single-side formworks; the supporting frame is installed on the cushion layer and connected to the reinforcing assemblies on the opposite sides of the two single-side formworks arranged in pairs; and the anti-floating piece is placed on the supporting frame. The problems that when the pit wall is built in the underlying part in the foundation pit, construction is tedious, efficiency is low, and settlement risks exist in the later period are solved.
本发明公开了一种岩石地质基础反向模板结构及其施工方法,该结构包括:成对设置的多个单侧模板,设置于岩石地质内开挖形成的下沉坑中,所述下沉坑的坑底浇筑有支撑于所述单侧模板的垫层,所述单侧模板与所述下沉坑的坑壁之间围合形成浇筑空间;加固组件,安装于所述单侧模板的相对侧;支承架,安装于所述垫层上且连接于成对设置的两所述单侧模板的相对侧的加固组件;抗浮件,搁置于所述支承架。本发明解决了基坑内的下卧部位内构建其坑壁时,施工繁琐、效率低且后期存在沉降风险的问题。
Rock geological foundation reverse formwork structure and construction method thereof
The invention discloses a rock geology foundation reverse formwork structure and a construction method thereof.The structure comprises a plurality of single-side formworks arranged in pairs and arranged in a sinking pit formed by excavation in rock geology, and a cushion layer supported on the single-side formworks is poured at the bottom of the sinking pit; a pouring space is defined by the single-side formwork and the pit wall of the sinking pit. The reinforcing assemblies are mounted on the opposite sides of the single-side formworks; the supporting frame is installed on the cushion layer and connected to the reinforcing assemblies on the opposite sides of the two single-side formworks arranged in pairs; and the anti-floating piece is placed on the supporting frame. The problems that when the pit wall is built in the underlying part in the foundation pit, construction is tedious, efficiency is low, and settlement risks exist in the later period are solved.
本发明公开了一种岩石地质基础反向模板结构及其施工方法,该结构包括:成对设置的多个单侧模板,设置于岩石地质内开挖形成的下沉坑中,所述下沉坑的坑底浇筑有支撑于所述单侧模板的垫层,所述单侧模板与所述下沉坑的坑壁之间围合形成浇筑空间;加固组件,安装于所述单侧模板的相对侧;支承架,安装于所述垫层上且连接于成对设置的两所述单侧模板的相对侧的加固组件;抗浮件,搁置于所述支承架。本发明解决了基坑内的下卧部位内构建其坑壁时,施工繁琐、效率低且后期存在沉降风险的问题。
Rock geological foundation reverse formwork structure and construction method thereof
岩石地质基础反向模板结构及其施工方法
WANG ZHENGQI (Autor:in) / PAN PENG (Autor:in) / QIN DANDAN (Autor:in) / ZHOU LU (Autor:in) / LI DAWEI (Autor:in) / ZHAO DELONG (Autor:in) / LI LONGFEI (Autor:in)
03.02.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation formwork shaping device under hard rock geological condition and construction method
Europäisches Patentamt | 2024
|Reverse ridge formwork structure and construction method thereof
Europäisches Patentamt | 2021
|FOUNDATION FORMWORK STRUCTURE AND FOUNDATION FORMWORK METHOD
Europäisches Patentamt | 2024
|Raft foundation side formwork structure and construction method thereof
Europäisches Patentamt | 2023
|FORMWORK, FOUNDATION, AND FOUNDATION CONSTRUCTION METHOD
Europäisches Patentamt | 2024
|