Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation formwork shaping device under hard rock geological condition and construction method
The invention discloses a foundation template shaping device under a hard rock geological condition, which is characterized by comprising a clamping plate, the clamping plate is arranged on a plane, a positioning probe is arranged on the clamping plate, the clamping plate is controlled to be released and fixed by the positioning probe, the positioning probe is arranged in the clamping plate, and the positioning probe measures the shape of the hard rock geological condition when being released; the clamping plate is provided with a measuring unit used for measuring the positioning probes, a buckling unit used for controlling the positioning probes and a positioning unit used for positioning the clamping plate, the measuring unit comprises a handle and scale marks which are arranged on the clamping plate, and the scale marks are used for reading the number of released positioning probes. According to the foundation template shaping device under the hard rock geological condition, the size and the outline of a required template can be accurately measured according to different terrains. And secondly, the positioning rods are arranged on the side face of the device, effective positioning can be conducted when the device encounters ultra-long terrains, formwork customization is conducted in a segmented mode, and the application range of the tool is widened.
本发明公开了一种坚岩地质条件下基础模板定型装置,其特征在于,包括:夹板,夹板设置在一平面上,夹板上设置有定位探头,夹板控制于定位探头释放和固定,定位探头设置在夹板中,定位探头在释放时测量坚岩地质的形状,夹板上设置有用于测量定位探头的测量单元,和用于控制定位探头卡扣单元,以及用于对夹板定位的定位单元,测量单元包括设置在夹板上的把手和刻度线,刻度线用于读取定位探头释放的数量。该坚岩地质条件下基础模板定型装置,可以根据不同地形精准测量出所需模板尺寸及轮廓。其次装置侧面带有定位杆,遇到超长地形可以有效进行定位,分段进行模板定制,增加了工具的适用范围。
Foundation formwork shaping device under hard rock geological condition and construction method
The invention discloses a foundation template shaping device under a hard rock geological condition, which is characterized by comprising a clamping plate, the clamping plate is arranged on a plane, a positioning probe is arranged on the clamping plate, the clamping plate is controlled to be released and fixed by the positioning probe, the positioning probe is arranged in the clamping plate, and the positioning probe measures the shape of the hard rock geological condition when being released; the clamping plate is provided with a measuring unit used for measuring the positioning probes, a buckling unit used for controlling the positioning probes and a positioning unit used for positioning the clamping plate, the measuring unit comprises a handle and scale marks which are arranged on the clamping plate, and the scale marks are used for reading the number of released positioning probes. According to the foundation template shaping device under the hard rock geological condition, the size and the outline of a required template can be accurately measured according to different terrains. And secondly, the positioning rods are arranged on the side face of the device, effective positioning can be conducted when the device encounters ultra-long terrains, formwork customization is conducted in a segmented mode, and the application range of the tool is widened.
本发明公开了一种坚岩地质条件下基础模板定型装置,其特征在于,包括:夹板,夹板设置在一平面上,夹板上设置有定位探头,夹板控制于定位探头释放和固定,定位探头设置在夹板中,定位探头在释放时测量坚岩地质的形状,夹板上设置有用于测量定位探头的测量单元,和用于控制定位探头卡扣单元,以及用于对夹板定位的定位单元,测量单元包括设置在夹板上的把手和刻度线,刻度线用于读取定位探头释放的数量。该坚岩地质条件下基础模板定型装置,可以根据不同地形精准测量出所需模板尺寸及轮廓。其次装置侧面带有定位杆,遇到超长地形可以有效进行定位,分段进行模板定制,增加了工具的适用范围。
Foundation formwork shaping device under hard rock geological condition and construction method
一种坚岩地质条件下基础模板定型装置及施工方法
CUI XUDONG (Autor:in) / WANG WEISONG (Autor:in) / WEI YIHENG (Autor:in)
17.09.2024
Patent
Elektronische Ressource
Chinesisch
Rock geological foundation reverse formwork structure and construction method thereof
Europäisches Patentamt | 2023
|Open caisson sinking construction method under hard rock geological condition
Europäisches Patentamt | 2022
|Pile foundation steel casing construction method under bare rock geological condition
Europäisches Patentamt | 2024
|Special-shaped foundation shaping formwork and construction method thereof
Europäisches Patentamt | 2022
|Intensive equipment foundation group shaping formwork system and construction method
Europäisches Patentamt | 2021
|