Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention belongs to the technical field of building structures, and particularly discloses an outer wall fireproof key joint construction method which comprises the following steps: step 1, manufacturing an upper outer wall body, a lower outer wall body and a floor slab; secondly, the upper outer wall body and the lower outer wall body are hoisted to design positions; thirdly, the floor slab is hoisted, and an upper positioning inserting groove and a lower positioning inserting groove are connected with an upper positioning rib plate and a lower positioning rib plate in an inserted mode; fourthly, the floor slab, the upper positioning rib plate, the lower positioning rib plate and the connecting pieces are fixedly connected together through bolts; fifthly, a sealing piece is plugged in a groove opening of the upper connecting groove; sixthly, floor beams are fixedly connected to the bottoms of the floor slabs, and inserting holes formed in one sides of the floor beams are connected with one sides of the connecting pieces in an inserted mode; seventhly, the space between the floor beam and the lower outer wall body is filled with flexible materials, and fireproof plugs are arranged on the peripheral sides of the flexible materials; the structure is reasonable, construction is easy, and the structural strength, the sealing performance and the fireproof performance of the connecting joint are effectively guaranteed.
本发明属于建筑结构技术领域,具体公开了一种外墙防火关键节点的施工方法,包括以下步骤以下步骤:步骤一:制作上部外墙体、下部外墙体以及楼板;步骤二:将上部外墙体、下部外墙体吊装至设计位置;步骤三:将楼板吊起并将上定位插槽、下定位插槽与上定位筋板、下定位筋板插接;步骤四:将楼板、上定位筋板、下定位筋板以及连接件之间通过螺栓固接在一起;步骤五:将密封件封堵在上连接槽的槽口;步骤六:在楼板的底部固接楼面梁,并将楼面梁一侧开设的插孔与连接件的一侧插接;步骤七:在楼面梁与下部外墙体之间填充柔性材料,且柔性材料的周侧均设置防火封堵;本发明结构合理,施工简单,有效保证了连接节点的结构强度、密封性以及防火性。
The invention belongs to the technical field of building structures, and particularly discloses an outer wall fireproof key joint construction method which comprises the following steps: step 1, manufacturing an upper outer wall body, a lower outer wall body and a floor slab; secondly, the upper outer wall body and the lower outer wall body are hoisted to design positions; thirdly, the floor slab is hoisted, and an upper positioning inserting groove and a lower positioning inserting groove are connected with an upper positioning rib plate and a lower positioning rib plate in an inserted mode; fourthly, the floor slab, the upper positioning rib plate, the lower positioning rib plate and the connecting pieces are fixedly connected together through bolts; fifthly, a sealing piece is plugged in a groove opening of the upper connecting groove; sixthly, floor beams are fixedly connected to the bottoms of the floor slabs, and inserting holes formed in one sides of the floor beams are connected with one sides of the connecting pieces in an inserted mode; seventhly, the space between the floor beam and the lower outer wall body is filled with flexible materials, and fireproof plugs are arranged on the peripheral sides of the flexible materials; the structure is reasonable, construction is easy, and the structural strength, the sealing performance and the fireproof performance of the connecting joint are effectively guaranteed.
本发明属于建筑结构技术领域,具体公开了一种外墙防火关键节点的施工方法,包括以下步骤以下步骤:步骤一:制作上部外墙体、下部外墙体以及楼板;步骤二:将上部外墙体、下部外墙体吊装至设计位置;步骤三:将楼板吊起并将上定位插槽、下定位插槽与上定位筋板、下定位筋板插接;步骤四:将楼板、上定位筋板、下定位筋板以及连接件之间通过螺栓固接在一起;步骤五:将密封件封堵在上连接槽的槽口;步骤六:在楼板的底部固接楼面梁,并将楼面梁一侧开设的插孔与连接件的一侧插接;步骤七:在楼面梁与下部外墙体之间填充柔性材料,且柔性材料的周侧均设置防火封堵;本发明结构合理,施工简单,有效保证了连接节点的结构强度、密封性以及防火性。
Construction method for fireproof key joint of outer wall
一种外墙防火关键节点的施工方法
GAO YANG (Autor:in)
03.02.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
OUTER WALL FIREPROOF STRUCTURE FOR STEEL-FRAME CONSTRUCTION
Europäisches Patentamt | 2015
|