Construction method for distributed photovoltaic project pool part of sewage plant
The invention discloses a sewage plant distributed photovoltaic project pool part construction method, which comprises the following steps of: combining and splicing a steel structure upright post, a base, a cross beam and a purlin supporting plate on the ground, and integrally hoisting the upright post and the base part after splicing; chemical foundation bolts are embedded after foundation grooves in the wall of the pool are formed, bases, stand columns, cross beams and purlin supporting plates are spliced in a ground construction area, hoisting is conducted through a truck crane after splicing is completed, the bases and the stand columns are installed firstly, then the cross beams and the purlin supporting plates are installed, and finally Z-shaped steel is installed; after all the steel structures are installed, photovoltaic assemblies are installed, and the photovoltaic assemblies are fixed to the Z-shaped steel through pressing blocks. According to the invention, the requirements of engineering on site conditions are reduced, the difficulty and construction risk of high-altitude installation are reduced, the high-altitude workload is reduced, the occupancy rate of site area and construction time is also reduced, the effective utilization rate of the construction site is improved, the construction progress is accelerated, and the engineering cost investments of manpower, machinery, materials and the like are saved.
本发明公开了一种污水厂分布式光伏项目水池部分施工方法,将钢结构立柱、底座,横梁、檩托板在地面组合拼装,拼装后立柱与底座部分整体吊装;水池墙壁上基础槽开好后将化学地脚螺栓埋入,在地面施工区域对底座和立柱、横梁和檩托板进行拼装,拼装完成后利用汽车吊进行吊装,先进行底座和立柱的安装,再进行横梁和檩托板安装,最后进行Z型钢的安装;所有钢结构安装完成后,再进行光伏组件的安装,光伏组件由压块固定在Z型钢上。本发明降低了工程对场地条件的要求,降低了高空安装的难度和施工风险,减少了高空工作量,也减少了对场地面积和施工时间上的占有率,提高了施工场地有效利用率,加快了施工进程,节省了人工、机械、材料等工程成本投资。
Construction method for distributed photovoltaic project pool part of sewage plant
The invention discloses a sewage plant distributed photovoltaic project pool part construction method, which comprises the following steps of: combining and splicing a steel structure upright post, a base, a cross beam and a purlin supporting plate on the ground, and integrally hoisting the upright post and the base part after splicing; chemical foundation bolts are embedded after foundation grooves in the wall of the pool are formed, bases, stand columns, cross beams and purlin supporting plates are spliced in a ground construction area, hoisting is conducted through a truck crane after splicing is completed, the bases and the stand columns are installed firstly, then the cross beams and the purlin supporting plates are installed, and finally Z-shaped steel is installed; after all the steel structures are installed, photovoltaic assemblies are installed, and the photovoltaic assemblies are fixed to the Z-shaped steel through pressing blocks. According to the invention, the requirements of engineering on site conditions are reduced, the difficulty and construction risk of high-altitude installation are reduced, the high-altitude workload is reduced, the occupancy rate of site area and construction time is also reduced, the effective utilization rate of the construction site is improved, the construction progress is accelerated, and the engineering cost investments of manpower, machinery, materials and the like are saved.
本发明公开了一种污水厂分布式光伏项目水池部分施工方法,将钢结构立柱、底座,横梁、檩托板在地面组合拼装,拼装后立柱与底座部分整体吊装;水池墙壁上基础槽开好后将化学地脚螺栓埋入,在地面施工区域对底座和立柱、横梁和檩托板进行拼装,拼装完成后利用汽车吊进行吊装,先进行底座和立柱的安装,再进行横梁和檩托板安装,最后进行Z型钢的安装;所有钢结构安装完成后,再进行光伏组件的安装,光伏组件由压块固定在Z型钢上。本发明降低了工程对场地条件的要求,降低了高空安装的难度和施工风险,减少了高空工作量,也减少了对场地面积和施工时间上的占有率,提高了施工场地有效利用率,加快了施工进程,节省了人工、机械、材料等工程成本投资。
Construction method for distributed photovoltaic project pool part of sewage plant
一种污水厂分布式光伏项目水池部分施工方法
LI JUN (Autor:in) / LI SHUXIN (Autor:in) / YU HUAWEI (Autor:in) / XIA XINBING (Autor:in) / LI CHENG (Autor:in) / LI HUI (Autor:in) / GUO RUI (Autor:in) / ZHANG WEI (Autor:in) / REN GUOQI (Autor:in) / XIONG WEIMIN (Autor:in)
07.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04G
SCAFFOLDING
,
Baugerüste
/
H02S
GENERATION OF ELECTRIC POWER BY CONVERSION OF INFRA-RED RADIATION, VISIBLE LIGHT OR ULTRAVIOLET LIGHT, E.G. USING PHOTOVOLTAIC [PV] MODULES
,
Erzeugung elektrischer Energie durch Umwandlung von Infrarot-Strahlung, sichtbarem Licht oder ultraviolettem Licht, z.B. unter Verwendung von Photovoltaik [PV]-Modulen
Solar photovoltaic system with sewage pool sealing function
Europäisches Patentamt | 2022
|Sewage pool photovoltaic system installed on pool and used for in-pool fire fighting
Europäisches Patentamt | 2023
|Sewage treatment plant pool body pool wall formwork and modeling method thereof
Europäisches Patentamt | 2020
|Construction method of anti-corrosion layer in sewage pool
Europäisches Patentamt | 2024
|