Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Ultra-wide steel box girder machining and assembling method for bridge and machining control device
The invention provides an ultra-wide steel box girder machining and assembling method for a bridge and a machining control device, and relates to the field of bridge engineering. The ultra-wide steel box girder machining and assembling method for the bridge and the machining control device comprise two supporting arms, a cross beam is fixedly connected to the upper ends of the two supporting arms, bases are arranged at the lower ends of the two supporting arms in a clamped mode, and each base is composed of a first supporting seat and a second supporting seat; clamping grooves are formed in the middles of the interiors of the two bases, and mounting plates are arranged at the front ends and the rear ends of the two first supporting bases and the second supporting bases and located at the connecting positions of the first supporting bases and the second supporting bases. According to the method, the whole steel box girder segments can be assembled by adopting a multi-segment continuous matching and assembling scheme, so that assembly welding and pre-assembling are completed at the same time, and the problem that most existing steel box girders are low in machining and assembling efficiency is solved.
本发明提供一种桥梁用超宽钢箱梁加工及拼装方法及加工控制装置,涉及桥梁工程领域。该桥梁用超宽钢箱梁加工及拼装方法及加工控制装置,包括支撑臂,所述支撑臂数量为两个,两个所述支撑臂上端固定连接有横梁,两个所述支撑臂下端均卡接设置有底座,两个所述底座均由第一支撑座和第二支撑座组成,两个所述底座内中部均开设有卡槽,两个所述第一支撑座和第二支撑座前后两端且位于其连接处均设置有安装板。本发明中能够将整体钢箱梁节段拼装采用多节段连续匹配拼装方案,实现组焊与预拼装同时完成,解决了现有大多数钢箱梁加工和拼装效率低的问题。
Ultra-wide steel box girder machining and assembling method for bridge and machining control device
The invention provides an ultra-wide steel box girder machining and assembling method for a bridge and a machining control device, and relates to the field of bridge engineering. The ultra-wide steel box girder machining and assembling method for the bridge and the machining control device comprise two supporting arms, a cross beam is fixedly connected to the upper ends of the two supporting arms, bases are arranged at the lower ends of the two supporting arms in a clamped mode, and each base is composed of a first supporting seat and a second supporting seat; clamping grooves are formed in the middles of the interiors of the two bases, and mounting plates are arranged at the front ends and the rear ends of the two first supporting bases and the second supporting bases and located at the connecting positions of the first supporting bases and the second supporting bases. According to the method, the whole steel box girder segments can be assembled by adopting a multi-segment continuous matching and assembling scheme, so that assembly welding and pre-assembling are completed at the same time, and the problem that most existing steel box girders are low in machining and assembling efficiency is solved.
本发明提供一种桥梁用超宽钢箱梁加工及拼装方法及加工控制装置,涉及桥梁工程领域。该桥梁用超宽钢箱梁加工及拼装方法及加工控制装置,包括支撑臂,所述支撑臂数量为两个,两个所述支撑臂上端固定连接有横梁,两个所述支撑臂下端均卡接设置有底座,两个所述底座均由第一支撑座和第二支撑座组成,两个所述底座内中部均开设有卡槽,两个所述第一支撑座和第二支撑座前后两端且位于其连接处均设置有安装板。本发明中能够将整体钢箱梁节段拼装采用多节段连续匹配拼装方案,实现组焊与预拼装同时完成,解决了现有大多数钢箱梁加工和拼装效率低的问题。
Ultra-wide steel box girder machining and assembling method for bridge and machining control device
一种桥梁用超宽钢箱梁加工及拼装方法及加工控制装置
LIU YANG (Autor:in) / WANG JIANGUO (Autor:in) / ZENG YONGHUI (Autor:in) / WANG LIWEI (Autor:in) / MA HAOPENG (Autor:in) / LI WEI (Autor:in) / ZHAO XUDONG (Autor:in) / WANG JINYU (Autor:in) / XU MENG (Autor:in) / XIAO YI (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Overall assembling method for ultra-wide framing steel box girder
Europäisches Patentamt | 2020
|Large-span ultra-wide steel box girder bridge construction linear control technology
Europäisches Patentamt | 2021
|STEEL-CONCRETE COMPOSITE GIRDER AND BRIDGE ASSEMBLING DEVICE AND METHOD
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|