Integrated pouring column foot of electric power pipe gallery and construction method of integrated pouring column foot
The invention belongs to the technical field of electric power pipe gallery constructional engineering, and particularly relates to an electric power pipe gallery integrated pouring column base and a construction method. The electric power pipe gallery integrated pouring column base comprises scaffold steel pipes, C25 column base steel bars and C20 steel bars. The C25 column foot reinforcing steel bars extend into the electric power pipe gallery construction foundation and are connected with the column foot bottom plate; one end, close to the column base bottom plate, of the C25 column base steel bar is connected with a C20 steel bar; the C20 steel bars are connected with the column base bottom plate; the ends, located outside the electric power pipe gallery construction foundation, of the C25 column foot steel bars are connected with the scaffold steel pipes. Compared with the prior art, the scaffold and the column foot steel bars are more convenient to dismantle, and the pouring quality of foundation concrete is not affected; and meanwhile, the water stop ring is arranged, underground water can be effectively prevented from leaking upwards along the column foot steel bars, the waterproof effect of the electric power pipe gallery is guaranteed, meanwhile, the construction progress is accelerated, and the engineering quality is guaranteed.
本发明属于电力管廊建筑工程技术领域,体涉及一种电力管廊一体化浇筑柱脚及施工方法;所述电力管廊一体化浇筑柱脚包括:脚手架钢管、C25柱脚钢筋和C20钢筋;所述C25柱脚钢筋伸入电力管廊施工基础中,并与柱脚底板连接;所述C25柱脚钢筋靠近所述柱脚底板的一端连接C20钢筋;所述C20钢筋与柱脚底板连接;所述C25柱脚钢筋位于所述电力管廊施工基础外的一端与所述脚手架钢管连接。与现有技术相比,本发明的脚手架及柱脚钢筋拆除时更加方便,且不影响基础混凝土的浇筑质量;同时通过设置止水环,能够有效阻止地下水沿柱脚钢筋向上渗漏,保证了电力管廊的防水效果,同时加快了施工进度,保证工程质量。
Integrated pouring column foot of electric power pipe gallery and construction method of integrated pouring column foot
The invention belongs to the technical field of electric power pipe gallery constructional engineering, and particularly relates to an electric power pipe gallery integrated pouring column base and a construction method. The electric power pipe gallery integrated pouring column base comprises scaffold steel pipes, C25 column base steel bars and C20 steel bars. The C25 column foot reinforcing steel bars extend into the electric power pipe gallery construction foundation and are connected with the column foot bottom plate; one end, close to the column base bottom plate, of the C25 column base steel bar is connected with a C20 steel bar; the C20 steel bars are connected with the column base bottom plate; the ends, located outside the electric power pipe gallery construction foundation, of the C25 column foot steel bars are connected with the scaffold steel pipes. Compared with the prior art, the scaffold and the column foot steel bars are more convenient to dismantle, and the pouring quality of foundation concrete is not affected; and meanwhile, the water stop ring is arranged, underground water can be effectively prevented from leaking upwards along the column foot steel bars, the waterproof effect of the electric power pipe gallery is guaranteed, meanwhile, the construction progress is accelerated, and the engineering quality is guaranteed.
本发明属于电力管廊建筑工程技术领域,体涉及一种电力管廊一体化浇筑柱脚及施工方法;所述电力管廊一体化浇筑柱脚包括:脚手架钢管、C25柱脚钢筋和C20钢筋;所述C25柱脚钢筋伸入电力管廊施工基础中,并与柱脚底板连接;所述C25柱脚钢筋靠近所述柱脚底板的一端连接C20钢筋;所述C20钢筋与柱脚底板连接;所述C25柱脚钢筋位于所述电力管廊施工基础外的一端与所述脚手架钢管连接。与现有技术相比,本发明的脚手架及柱脚钢筋拆除时更加方便,且不影响基础混凝土的浇筑质量;同时通过设置止水环,能够有效阻止地下水沿柱脚钢筋向上渗漏,保证了电力管廊的防水效果,同时加快了施工进度,保证工程质量。
Integrated pouring column foot of electric power pipe gallery and construction method of integrated pouring column foot
一种电力管廊一体化浇筑柱脚及其施工方法
DO SUNG-SUNG (Autor:in) / FU SHAOSHUAI (Autor:in) / BAI XUEBING (Autor:in) / GE XUYAO (Autor:in) / LIU YANG (Autor:in) / WANG CHUNWEI (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch
Steel structure column foot grouting pouring auxiliary device and construction method
Europäisches Patentamt | 2023
|Concrete pouring construction method in steel pipe column
Europäisches Patentamt | 2021
|Building beam-column integrated pouring formwork system and construction method
Europäisches Patentamt | 2023
|