The invention relates to the technical field of building construction, and discloses a prefabricated concrete protective layer and reinforcement cage integrated preparation method which is characterized by comprising the following steps: S1, splicing steel bars into a shape matched with the style of a concrete member in a fixed connection (welding or bundling) manner to form a reinforcement cage; s2, a mother board is preset, concrete is poured on the mother board to form a layer body, and the mother board 1 and the layer body are combined to form a protective layer; s3, a plurality of fasteners penetrating through the layer body are fixedly connected to the layer body 2; s4, according to the matched component deepening drawing, the grooving position and shape are determined; and S5, a plurality of first through grooves are formed in the layer body, the layer body is divided into sections through the first through grooves, the number of the divided sections of the layer body is matched with the number of the side faces of the reinforcement cage to be wrapped, second through grooves are formed in the face, opposite to the grooved face, of the layer body, the number of the second through grooves is matched with the number of the first through grooves, and the positions of the second through grooves are opposite to the first through grooves.
本发明涉及建筑施工技术领域,公开了预制混凝土保护层与钢筋笼一体化制备方法,其技术方案要点是包括以下步骤:S1,将钢筋通过固定连接(焊接或者捆扎)的方式拼接成与混凝土构件样式匹配的外形,形成钢筋笼;S2,预设母板,在母板上浇筑混凝土形成层体,母板1和层体组合成保护层;S3,在层体2上固定连接若干贯穿层体的紧固件;S4,据匹配的构件深化图纸,确定开槽位置及形状;S5,在层体上开设若干第一通槽,若干第一通槽将层体分割成段,层体被分割的段数与待包裹钢筋笼侧面数量匹配,在层体已经开槽一面相对的一面上开设第二通槽,第二通槽的数量与第一通槽匹配,位置与第一通槽相对。
The invention relates to the technical field of building construction, and discloses a prefabricated concrete protective layer and reinforcement cage integrated preparation method which is characterized by comprising the following steps: S1, splicing steel bars into a shape matched with the style of a concrete member in a fixed connection (welding or bundling) manner to form a reinforcement cage; s2, a mother board is preset, concrete is poured on the mother board to form a layer body, and the mother board 1 and the layer body are combined to form a protective layer; s3, a plurality of fasteners penetrating through the layer body are fixedly connected to the layer body 2; s4, according to the matched component deepening drawing, the grooving position and shape are determined; and S5, a plurality of first through grooves are formed in the layer body, the layer body is divided into sections through the first through grooves, the number of the divided sections of the layer body is matched with the number of the side faces of the reinforcement cage to be wrapped, second through grooves are formed in the face, opposite to the grooved face, of the layer body, the number of the second through grooves is matched with the number of the first through grooves, and the positions of the second through grooves are opposite to the first through grooves.
本发明涉及建筑施工技术领域,公开了预制混凝土保护层与钢筋笼一体化制备方法,其技术方案要点是包括以下步骤:S1,将钢筋通过固定连接(焊接或者捆扎)的方式拼接成与混凝土构件样式匹配的外形,形成钢筋笼;S2,预设母板,在母板上浇筑混凝土形成层体,母板1和层体组合成保护层;S3,在层体2上固定连接若干贯穿层体的紧固件;S4,据匹配的构件深化图纸,确定开槽位置及形状;S5,在层体上开设若干第一通槽,若干第一通槽将层体分割成段,层体被分割的段数与待包裹钢筋笼侧面数量匹配,在层体已经开槽一面相对的一面上开设第二通槽,第二通槽的数量与第一通槽匹配,位置与第一通槽相对。
Prefabricated concrete protection layer and reinforcement cage integrated preparation method
预制混凝土保护层与钢筋笼一体化制备方法
MA QIANLI (Autor:in)
14.03.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
/
E04G
SCAFFOLDING
,
Baugerüste
Semi-prefabricated concrete reinforcement cage underground diaphragm wall and construction method
Europäisches Patentamt | 2021
|Synthesis technology of prefabricated reinforcement cage
Europäisches Patentamt | 2015
|Reinforcement cage protection layer protection device
Europäisches Patentamt | 2024
|Prefabricated reinforcement cage device and manufacturing method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|