Construction method of bank slope concrete protection foot
The invention provides a construction method of a bank slope concrete toe guard, which is characterized by comprising the following steps of: 1, measuring and positioning a toe groove, and excavating the earthwork of the toe groove; 2, foot groove bases are tamped; thirdly, a gravel mixture cushion layer is laid; fourthly, the combined steel formwork is installed and reinforced; 5, filling the two sides of the foot groove with gravel mixtures; sixthly, foot groove concrete is poured in a layered mode; seventhly, the formwork is hoisted and detached, and concrete curing is conducted. According to the method, mounting is convenient, the construction efficiency is high, turnover is convenient, and mounting and hoisting dismounting of the steel formwork can be rapidly achieved. And the stability of side slopes on the two sides of the foot groove is guaranteed while filling of the gravel mixture is facilitated, secondary construction caused by collapse of the foot groove is avoided, and the cost is reduced. The construction quality of foot groove concrete pouring is improved, the phenomenon of formwork explosion is effectively reduced, and excessive use of concrete is avoided.
本发明提供了一种岸坡混凝土护脚的施工方法,其特征在于,包括如下步骤:步骤一,脚槽测量定位,脚槽土方开挖;步骤二,脚槽基底夯实;步骤三,砂石混合料垫层铺设;步骤四,组合式钢模板安装及加固;步骤五,脚槽两侧砂石混合料填充;步骤六:脚槽混凝土分层浇筑;步骤七,模板吊拆及砼养护。本发明方法安装方便,施工效率高,周转便利,能够快速实现钢模板的安装与吊拆。便于砂石混合料的填充的同时,保证了脚槽两侧边坡的稳定避免脚槽垮塌造成的二次施工,减少成本。提高了脚槽砼浇筑的施工质量,有效减少了爆模情况的出现,避免了混凝土的过多使用。
Construction method of bank slope concrete protection foot
The invention provides a construction method of a bank slope concrete toe guard, which is characterized by comprising the following steps of: 1, measuring and positioning a toe groove, and excavating the earthwork of the toe groove; 2, foot groove bases are tamped; thirdly, a gravel mixture cushion layer is laid; fourthly, the combined steel formwork is installed and reinforced; 5, filling the two sides of the foot groove with gravel mixtures; sixthly, foot groove concrete is poured in a layered mode; seventhly, the formwork is hoisted and detached, and concrete curing is conducted. According to the method, mounting is convenient, the construction efficiency is high, turnover is convenient, and mounting and hoisting dismounting of the steel formwork can be rapidly achieved. And the stability of side slopes on the two sides of the foot groove is guaranteed while filling of the gravel mixture is facilitated, secondary construction caused by collapse of the foot groove is avoided, and the cost is reduced. The construction quality of foot groove concrete pouring is improved, the phenomenon of formwork explosion is effectively reduced, and excessive use of concrete is avoided.
本发明提供了一种岸坡混凝土护脚的施工方法,其特征在于,包括如下步骤:步骤一,脚槽测量定位,脚槽土方开挖;步骤二,脚槽基底夯实;步骤三,砂石混合料垫层铺设;步骤四,组合式钢模板安装及加固;步骤五,脚槽两侧砂石混合料填充;步骤六:脚槽混凝土分层浇筑;步骤七,模板吊拆及砼养护。本发明方法安装方便,施工效率高,周转便利,能够快速实现钢模板的安装与吊拆。便于砂石混合料的填充的同时,保证了脚槽两侧边坡的稳定避免脚槽垮塌造成的二次施工,减少成本。提高了脚槽砼浇筑的施工质量,有效减少了爆模情况的出现,避免了混凝土的过多使用。
Construction method of bank slope concrete protection foot
一种岸坡混凝土护脚的施工方法
21.03.2023
Patent
Elektronische Ressource
Chinesisch
Fence type bank protection slope protection construction method
Europäisches Patentamt | 2024
|River bank slope protection structure and river bank slope protection method
Europäisches Patentamt | 2023
|Construction method for high slope concrete slope protection project
Europäisches Patentamt | 2021
|Concrete paver and concrete slope protection construction method
Europäisches Patentamt | 2023
|Ecological concrete bank protection structure for urban river bank slope improvement
Europäisches Patentamt | 2021
|