Inspection well construction technology and inspection well
The inspection well construction technology comprises the following specific steps that a steel cylinder well is installed, an excavation area is cut on a road surface, excavation is conducted in the excavation area, the steel cylinder well is shaken to the designed elevation, earthwork in the steel cylinder well is excavated out, and concrete is used for sealing the bottom; the inspection well is installed, and the inspection well is hoisted into the steel cylinder well; and well periphery backfilling is conducted, specifically, backfilling is conducted between the steel cylinder well and the inspection well through backfilling soil. The steel cylinder well is installed before the inspection well is installed, the steel cylinder well has a protective effect on constructors, and the backfill is filled between the steel cylinder well and the inspection well, so that the installation environment of the inspection well is improved, and the inspection well is installed more firmly and stably.
本申请涉及一种检查井施工工艺及检查井,具体步骤如下:钢筒井安装,在路面切割出开挖区,并在开挖区开挖,将钢筒井摇管至设计标高,将钢筒井内的土方挖除,并用混凝土封底;检查井安装,将检查井吊装到钢筒井内;井周回填,使用回填土对钢筒井与检查井之间进行回填。在检查井的安装前先进行钢筒井的安装,钢筒井对施工人员具有防护作用,且在钢筒井和检查井之间填充回填土,改善了检查井的安装环境,使得检查井的安装更加牢固稳定。
Inspection well construction technology and inspection well
The inspection well construction technology comprises the following specific steps that a steel cylinder well is installed, an excavation area is cut on a road surface, excavation is conducted in the excavation area, the steel cylinder well is shaken to the designed elevation, earthwork in the steel cylinder well is excavated out, and concrete is used for sealing the bottom; the inspection well is installed, and the inspection well is hoisted into the steel cylinder well; and well periphery backfilling is conducted, specifically, backfilling is conducted between the steel cylinder well and the inspection well through backfilling soil. The steel cylinder well is installed before the inspection well is installed, the steel cylinder well has a protective effect on constructors, and the backfill is filled between the steel cylinder well and the inspection well, so that the installation environment of the inspection well is improved, and the inspection well is installed more firmly and stably.
本申请涉及一种检查井施工工艺及检查井,具体步骤如下:钢筒井安装,在路面切割出开挖区,并在开挖区开挖,将钢筒井摇管至设计标高,将钢筒井内的土方挖除,并用混凝土封底;检查井安装,将检查井吊装到钢筒井内;井周回填,使用回填土对钢筒井与检查井之间进行回填。在检查井的安装前先进行钢筒井的安装,钢筒井对施工人员具有防护作用,且在钢筒井和检查井之间填充回填土,改善了检查井的安装环境,使得检查井的安装更加牢固稳定。
Inspection well construction technology and inspection well
检查井施工工艺及检查井
ZHANG ZHONGHUA (Autor:in) / FENG JUNWEI (Autor:in) / WANG SHIWANG (Autor:in) / JIN MIAOGUI (Autor:in) / XIANG LINGXIAO (Autor:in)
21.03.2023
Patent
Elektronische Ressource
Chinesisch
Inspection well ring composite structure and inspection well mouth construction method
Europäisches Patentamt | 2021
|Cast-in-place concrete inspection well construction technology