Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Frame beam different-grade concrete pouring device and using method thereof
The invention relates to a frame beam different-grade concrete pouring device which comprises a girder formwork, a steel reinforcement framework, an adjustable grating and two sealing inserting grooves, the steel reinforcement framework is fixed in the girder formwork, and gaps are formed in the two sides of the girder formwork and the two sides of the steel reinforcement framework; the width of the adjustable grating is adjustable, the periphery of the adjustable grating abuts against the steel reinforcement framework and is obliquely fixed in the steel reinforcement framework, the two sealing insertion grooves are formed in gaps between the girder formwork and the two sides of the steel reinforcement framework along the adjustable grating, and the width of the adjustable grating can be freely adjusted. The adjustable grid can be used for steel bar frameworks with different sizes or sizes having errors, column beam concrete and girder concrete are isolated through the adjustable grid, the back faces of the slot rods abut against a girder formwork, the air bags expand to extrude the steel bar frameworks after the air nozzles are inflated, and therefore gaps between the girder formwork and the two sides of the steel bar frameworks are sealed. And after pouring is completed, the interface of the column beam concrete and the girder concrete is regular.
本发明涉及一种框架梁异等级混凝土浇筑装置,包括大梁模板、钢筋骨架、可调格栅和两个密封插槽,钢筋骨架固定在大梁模板中,大梁模板与钢筋骨架的两侧具有间隙;可调格栅的宽度可调节,可调格栅的四周与钢筋骨架相抵接并倾斜固定在钢筋骨架内,二个密封插槽沿着可调格栅设置在大梁模板与钢筋骨架的两侧的间隙中,可调格栅的宽度可以自由调整,面对不同尺寸或者尺寸存在误差的的钢筋骨架都可使用,可调格栅将柱梁混凝土和大梁混凝土进行隔离,插槽杆的背面与大梁模板相抵接,通过气嘴充气后气囊膨胀挤压钢筋骨架,从而将大梁模板与钢筋骨架的两侧的间隙进行密闭,达到有效隔离的作用,浇筑完成后柱梁混凝土和大梁混凝土的分界面规则。
Frame beam different-grade concrete pouring device and using method thereof
The invention relates to a frame beam different-grade concrete pouring device which comprises a girder formwork, a steel reinforcement framework, an adjustable grating and two sealing inserting grooves, the steel reinforcement framework is fixed in the girder formwork, and gaps are formed in the two sides of the girder formwork and the two sides of the steel reinforcement framework; the width of the adjustable grating is adjustable, the periphery of the adjustable grating abuts against the steel reinforcement framework and is obliquely fixed in the steel reinforcement framework, the two sealing insertion grooves are formed in gaps between the girder formwork and the two sides of the steel reinforcement framework along the adjustable grating, and the width of the adjustable grating can be freely adjusted. The adjustable grid can be used for steel bar frameworks with different sizes or sizes having errors, column beam concrete and girder concrete are isolated through the adjustable grid, the back faces of the slot rods abut against a girder formwork, the air bags expand to extrude the steel bar frameworks after the air nozzles are inflated, and therefore gaps between the girder formwork and the two sides of the steel bar frameworks are sealed. And after pouring is completed, the interface of the column beam concrete and the girder concrete is regular.
本发明涉及一种框架梁异等级混凝土浇筑装置,包括大梁模板、钢筋骨架、可调格栅和两个密封插槽,钢筋骨架固定在大梁模板中,大梁模板与钢筋骨架的两侧具有间隙;可调格栅的宽度可调节,可调格栅的四周与钢筋骨架相抵接并倾斜固定在钢筋骨架内,二个密封插槽沿着可调格栅设置在大梁模板与钢筋骨架的两侧的间隙中,可调格栅的宽度可以自由调整,面对不同尺寸或者尺寸存在误差的的钢筋骨架都可使用,可调格栅将柱梁混凝土和大梁混凝土进行隔离,插槽杆的背面与大梁模板相抵接,通过气嘴充气后气囊膨胀挤压钢筋骨架,从而将大梁模板与钢筋骨架的两侧的间隙进行密闭,达到有效隔离的作用,浇筑完成后柱梁混凝土和大梁混凝土的分界面规则。
Frame beam different-grade concrete pouring device and using method thereof
一种框架梁异等级混凝土浇筑装置及其使用方法
ZHANG FENGYONG (Autor:in) / XU XIUZHEN (Autor:in) / SUN YING (Autor:in)
21.03.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2022
|High formwork frame column concrete pouring device and pouring method
Europäisches Patentamt | 2023
|Mass concrete pouring device and pouring method thereof
Europäisches Patentamt | 2024
|Precast beam pouring installation auxiliary frame and precast beam pouring method
Europäisches Patentamt | 2023
|