Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for aluminum alloy glass curtain wall of super high-rise building
The invention discloses a construction method for an aluminum alloy glass curtain wall of a super high-rise building, and relates to the technical field of building construction. According to the construction method for the aluminum alloy glass curtain wall of the super high-rise building, the steel stand column and the diagonal draw bar are fixed, the overhanging supporting arm is installed on the steel stand column, and then the annular track is installed on the overhanging supporting arm, so that glass curtain wall plates under two conditions can be conveyed to a designated installation area; the glass curtain wall plate can be quickly transported to any designated installation area, the installation efficiency is improved, and in addition, the quality of the glass curtain wall plate after installation is effectively guaranteed by additionally installing the sealing strips and checking the glass curtain wall plate after installation.
本发明公开了一种超高层建筑铝合金玻璃幕墙施工方法,涉及建筑施工技术领域。该超高层建筑铝合金玻璃幕墙施工方法,本发明通过固定钢立柱和斜拉杆,并在钢立柱上安装悬挑支臂,再于悬挑支臂安装环形轨道,能够提供两种情况下的玻璃幕墙板块运输至指定安装区域,达到快速的将玻璃幕墙板块运输至任意指定安装区域,提升安装效率,此外,通过密封条的加装和玻璃幕墙板块安装后的检查,有效的保障了玻璃幕墙板块安装后的质量。
Construction method for aluminum alloy glass curtain wall of super high-rise building
The invention discloses a construction method for an aluminum alloy glass curtain wall of a super high-rise building, and relates to the technical field of building construction. According to the construction method for the aluminum alloy glass curtain wall of the super high-rise building, the steel stand column and the diagonal draw bar are fixed, the overhanging supporting arm is installed on the steel stand column, and then the annular track is installed on the overhanging supporting arm, so that glass curtain wall plates under two conditions can be conveyed to a designated installation area; the glass curtain wall plate can be quickly transported to any designated installation area, the installation efficiency is improved, and in addition, the quality of the glass curtain wall plate after installation is effectively guaranteed by additionally installing the sealing strips and checking the glass curtain wall plate after installation.
本发明公开了一种超高层建筑铝合金玻璃幕墙施工方法,涉及建筑施工技术领域。该超高层建筑铝合金玻璃幕墙施工方法,本发明通过固定钢立柱和斜拉杆,并在钢立柱上安装悬挑支臂,再于悬挑支臂安装环形轨道,能够提供两种情况下的玻璃幕墙板块运输至指定安装区域,达到快速的将玻璃幕墙板块运输至任意指定安装区域,提升安装效率,此外,通过密封条的加装和玻璃幕墙板块安装后的检查,有效的保障了玻璃幕墙板块安装后的质量。
Construction method for aluminum alloy glass curtain wall of super high-rise building
一种超高层建筑铝合金玻璃幕墙施工方法
ZHANG TAO (Autor:in) / SHI YUANZE (Autor:in) / YUE YANG (Autor:in)
31.03.2023
Patent
Elektronische Ressource
Chinesisch
Aluminum alloy glass curtain wall window sash connecting structure of super high-rise building
Europäisches Patentamt | 2023
|Noise reduction structure for aluminum alloy glass curtain wall of super high-rise building
Europäisches Patentamt | 2023
|Heat insulation structure of aluminum alloy glass curtain wall of super high-rise building
Europäisches Patentamt | 2022
|Construction method of super high-rise glass curtain wall
Europäisches Patentamt | 2023
|High-rise building curtain wall glass installation construction method
Europäisches Patentamt | 2021
|