Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Mounting method for anchorage cable sleeve of suspension bridge
The invention provides a mounting method of a suspension bridge anchorage cable sleeve. Comprising the following steps of preparing auxiliary equipment, performing early-stage preparation work, arranging a positioning frame, determining the axis of a first section of cable sleeve, adjusting the angle between the first section of cable sleeve and a design surface, fixing the first section of cable sleeve, determining the axis of an (N + 1) th section of cable sleeve, adjusting the angle between the (N + 1) th section of cable sleeve and the design surface, fixing the (N + 1) th section of cable sleeve, and installing a tail anchor backing plate. According to the invention, the accurate installation position of the cable sleeve can be quickly and accurately determined during construction.
本发明提供一种悬索桥锚碇索套管的安装方法,包括以下步骤:准备辅助设备、前期准备工作、布置定位架、第一节索套管的轴线确定、调节第一节索套管与设计面的角度、固定第一节索套管、第N+1节索套管的轴线确定、调节第N+1节索套管与设计面的角度、固定第N+1节索套管、末锚垫板的安装。本发明能够在施工中快速且准确地确定索套管的准确安装位置。
Mounting method for anchorage cable sleeve of suspension bridge
The invention provides a mounting method of a suspension bridge anchorage cable sleeve. Comprising the following steps of preparing auxiliary equipment, performing early-stage preparation work, arranging a positioning frame, determining the axis of a first section of cable sleeve, adjusting the angle between the first section of cable sleeve and a design surface, fixing the first section of cable sleeve, determining the axis of an (N + 1) th section of cable sleeve, adjusting the angle between the (N + 1) th section of cable sleeve and the design surface, fixing the (N + 1) th section of cable sleeve, and installing a tail anchor backing plate. According to the invention, the accurate installation position of the cable sleeve can be quickly and accurately determined during construction.
本发明提供一种悬索桥锚碇索套管的安装方法,包括以下步骤:准备辅助设备、前期准备工作、布置定位架、第一节索套管的轴线确定、调节第一节索套管与设计面的角度、固定第一节索套管、第N+1节索套管的轴线确定、调节第N+1节索套管与设计面的角度、固定第N+1节索套管、末锚垫板的安装。本发明能够在施工中快速且准确地确定索套管的准确安装位置。
Mounting method for anchorage cable sleeve of suspension bridge
一种悬索桥锚碇索套管的安装方法
JIANG GANYOU (Autor:in) / WEI YISONG (Autor:in) / WANG YUAN (Autor:in) / WANG NAISHUANG (Autor:in) / LIU SHENG (Autor:in) / LI SHENZHE (Autor:in) / YANG MINGQIN (Autor:in) / LU XINYU (Autor:in) / XIAO YIXIN (Autor:in) / CHEN SONGSONG (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Suspension bridge anchorage top plate mounting device and method
Europäisches Patentamt | 2024
|Main cable splay saddle for self-anchorage suspension bridge
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2015
|CONSTRUCTION METHOD FOR SPLAY CABLE SLEEVE OF SUSPENSION BRIDGE
Europäisches Patentamt | 2023
|