Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated bridge safety channel and construction method
The invention discloses an assembly type bridge safety channel and a construction method, the assembly type bridge safety channel comprises shear fork rods, the middles and the ends of the shear fork rods are rotationally connected through pin shafts, mounting blocks are rotationally mounted at the upper ends and the lower ends of the shear fork rods through rotating shafts, and stand columns are inserted into the mounting blocks from top to bottom. An upper limiting plate is fixedly connected to the position, close to the upper end, of the stand column, the upper limiting plate is located on the lower surface of the upper cover mounting plate, a lower limiting plate is fixedly connected to the upper portion of the stand column, and the lower limiting plate is located at the upper end of the upper mounting block. The middles and the ends of the shear fork rods are rotationally connected through the pin shafts, the angles of the shear fork rods can be adjusted, opening and closing of the shear fork rods are achieved, when the shear fork rods are closed, the occupied area is small, transportation is convenient, when the shear fork rods need to be installed, only the shear fork rods need to be opened, the shear fork rods do not need to be installed again on site, and convenience is achieved.
本发明公开了一种装配式桥梁安全通道及施工方法,包括剪叉杆,所述剪叉杆的中部之间以及端部之间均通过销轴转动连接,所述剪叉杆的上端以及下端均通过转动轴转动安装有安装块,所述安装块的内部从上向下插入有立柱。所述立柱靠近上端的位置固接有上限位板,且上限位板位于上盖安装板的下表面,所述立柱的上部固接有下限位板,且下限位板位于上方的所述安装块上端。本发明剪叉杆的中部之间以及端部之间均通过销轴转动连接,剪叉杆的角度能够调节,进而实现剪叉杆的张开以及闭合,当其闭合时占地面积小,方便运输,当需要安装剪叉杆时,只需要张开剪叉杆即可,不需要当场再次安装剪叉杆,较为方便。
Fabricated bridge safety channel and construction method
The invention discloses an assembly type bridge safety channel and a construction method, the assembly type bridge safety channel comprises shear fork rods, the middles and the ends of the shear fork rods are rotationally connected through pin shafts, mounting blocks are rotationally mounted at the upper ends and the lower ends of the shear fork rods through rotating shafts, and stand columns are inserted into the mounting blocks from top to bottom. An upper limiting plate is fixedly connected to the position, close to the upper end, of the stand column, the upper limiting plate is located on the lower surface of the upper cover mounting plate, a lower limiting plate is fixedly connected to the upper portion of the stand column, and the lower limiting plate is located at the upper end of the upper mounting block. The middles and the ends of the shear fork rods are rotationally connected through the pin shafts, the angles of the shear fork rods can be adjusted, opening and closing of the shear fork rods are achieved, when the shear fork rods are closed, the occupied area is small, transportation is convenient, when the shear fork rods need to be installed, only the shear fork rods need to be opened, the shear fork rods do not need to be installed again on site, and convenience is achieved.
本发明公开了一种装配式桥梁安全通道及施工方法,包括剪叉杆,所述剪叉杆的中部之间以及端部之间均通过销轴转动连接,所述剪叉杆的上端以及下端均通过转动轴转动安装有安装块,所述安装块的内部从上向下插入有立柱。所述立柱靠近上端的位置固接有上限位板,且上限位板位于上盖安装板的下表面,所述立柱的上部固接有下限位板,且下限位板位于上方的所述安装块上端。本发明剪叉杆的中部之间以及端部之间均通过销轴转动连接,剪叉杆的角度能够调节,进而实现剪叉杆的张开以及闭合,当其闭合时占地面积小,方便运输,当需要安装剪叉杆时,只需要张开剪叉杆即可,不需要当场再次安装剪叉杆,较为方便。
Fabricated bridge safety channel and construction method
一种装配式桥梁安全通道及施工方法
YANG BO (Autor:in) / SUN ZIRONG (Autor:in) / ZHU FENG (Autor:in) / TANG RENQING (Autor:in) / LYU XIANGXIANG (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Chinesisch
Fabricated bridge safety channel and construction method
Europäisches Patentamt | 2021
|Fabricated bridge safety channel and construction method
Europäisches Patentamt | 2024
|Fabricated stair safety channel and construction method
Europäisches Patentamt | 2024
|Fabricated bridge support and bridge construction method
Europäisches Patentamt | 2024
|