Stock yard roof film structure installation and construction method
The invention discloses an installation and construction method for a stock ground roof film structure. The installation and construction method comprises the steps that S1, a guide rail device is installed on a framework; s2, measuring, adjusting and correcting the framework and the guide rail device; s3, mounting film cloth on the guide rail device; s4, the membrane cloth is tensioned; s5, edge closing is conducted on the film cloth; s6, waterproof treatment is conducted on the guide rail device; the material yard roof film structure is low in overall manufacturing cost and short in construction period; the film cloth is tensioned and flattened by the tensioning device, and the aluminum alloy guide rail is covered by the aluminum alloy batten, so that the leakage of a joint can be prevented, and the maintenance is convenient; in the using process, the effects of good light transmission performance and high diffuse reflection rate are achieved, illumination in the greenhouse is not smaller than 100 Lx on sunny days, the illumination requirement of night work can be met only through few illumination facilities at night, and the energy-saving effect is remarkable; the PE film cloth is low in heat conductivity coefficient and strong in ultraviolet reflection capability, can enable the temperature difference inside and outside a building to be about 10 DEG C, and has the characteristics of heat preservation and heat insulation.
本发明公开了一种料场屋面膜结构安装施工方法,包括S1.在骨架上安装导轨装置;S2.测量、调整并矫正骨架和导轨装置;S3.在导轨装置上安装膜布;S4.对膜布进行张紧;S5.对膜布进行收边;S6.对导轨装置处进行防水处理;料场屋面膜结构整体造价低、施工周期短;利用张紧装置将膜布张拉平整,使用铝合金板条扣盖铝合金导轨,能防止接缝渗漏,便于维修;在使用过程中发挥了透光性能好及高漫反射率的效果,晴天时棚内照明不小于100Lx,夜间只需较少的照明设施即可满足夜间工作的照明需求,节能效果显著;PE膜布导热系数低,紫外线反射能力强,可使建筑内外温差在10℃左右,有保温隔热的特点。
Stock yard roof film structure installation and construction method
The invention discloses an installation and construction method for a stock ground roof film structure. The installation and construction method comprises the steps that S1, a guide rail device is installed on a framework; s2, measuring, adjusting and correcting the framework and the guide rail device; s3, mounting film cloth on the guide rail device; s4, the membrane cloth is tensioned; s5, edge closing is conducted on the film cloth; s6, waterproof treatment is conducted on the guide rail device; the material yard roof film structure is low in overall manufacturing cost and short in construction period; the film cloth is tensioned and flattened by the tensioning device, and the aluminum alloy guide rail is covered by the aluminum alloy batten, so that the leakage of a joint can be prevented, and the maintenance is convenient; in the using process, the effects of good light transmission performance and high diffuse reflection rate are achieved, illumination in the greenhouse is not smaller than 100 Lx on sunny days, the illumination requirement of night work can be met only through few illumination facilities at night, and the energy-saving effect is remarkable; the PE film cloth is low in heat conductivity coefficient and strong in ultraviolet reflection capability, can enable the temperature difference inside and outside a building to be about 10 DEG C, and has the characteristics of heat preservation and heat insulation.
本发明公开了一种料场屋面膜结构安装施工方法,包括S1.在骨架上安装导轨装置;S2.测量、调整并矫正骨架和导轨装置;S3.在导轨装置上安装膜布;S4.对膜布进行张紧;S5.对膜布进行收边;S6.对导轨装置处进行防水处理;料场屋面膜结构整体造价低、施工周期短;利用张紧装置将膜布张拉平整,使用铝合金板条扣盖铝合金导轨,能防止接缝渗漏,便于维修;在使用过程中发挥了透光性能好及高漫反射率的效果,晴天时棚内照明不小于100Lx,夜间只需较少的照明设施即可满足夜间工作的照明需求,节能效果显著;PE膜布导热系数低,紫外线反射能力强,可使建筑内外温差在10℃左右,有保温隔热的特点。
Stock yard roof film structure installation and construction method
一种料场屋面膜结构安装施工方法
GAO TIANQING (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|