Basement roof construction road and storage yard processing yard conversion method without trestle foundation pit
The invention discloses a trestle-free foundation pit basement roof construction road and storage yard processing yard conversion method which comprises the following steps: dividing a trestle-free foundation pit into a plurality of foundation pit units according to a pre-selling sequence of an assembly type residence group; a first storage yard processing site and a first temporary road are arranged in the foundation pit unit which is constructed later, and earthwork is sequentially excavated in the foundation pit unit which is constructed first and transported outwards through the first temporary road; constructing an underground structure of the foundation pit unit which is firstly constructed; a second storage yard processing site and a second temporary road are arranged on a top plate of the constructed underground structure, so that the first storage yard processing site is converted to the top plate of the constructed underground structure, earthwork excavated by the foundation pit unit after construction is transported outwards through the second temporary road, and the earthwork is transported outwards through the second temporary road at the position where the second temporary road is not overlapped with the fire-fighting road. And a beam plate of a top plate of the underground structure is reinforced. The problems that a trestle-free foundation pit is high in cost and long in construction period when a traditional foundation pit construction method is adopted are solved.
本发明公开了一种无栈桥基坑的地下室顶板施工道路及堆场加工场转换方法,包括:根据装配式住宅群的预售顺序,将无栈桥基坑划分为多个基坑单元;于后施工的基坑单元内设置第一堆场加工场和第一临时道路,于先施工的基坑单元依次开挖土方并将土方经由第一临时道路外运;施工先施工的基坑单元的地下结构;在已施工的地下结构的顶板上设置第二堆场加工场和第二临时道路,使得第一堆场加工场转换至已施工的地下结构的顶板上、后施工的基坑单元开挖的土方经由第二临时道路外运,在第二临时道路与消防道路不重合的位置,对地下结构的顶板的梁板进行加强。本发明解决了无栈桥基坑采用传统基坑施工方法存在成本高、施工工期长的问题。
Basement roof construction road and storage yard processing yard conversion method without trestle foundation pit
The invention discloses a trestle-free foundation pit basement roof construction road and storage yard processing yard conversion method which comprises the following steps: dividing a trestle-free foundation pit into a plurality of foundation pit units according to a pre-selling sequence of an assembly type residence group; a first storage yard processing site and a first temporary road are arranged in the foundation pit unit which is constructed later, and earthwork is sequentially excavated in the foundation pit unit which is constructed first and transported outwards through the first temporary road; constructing an underground structure of the foundation pit unit which is firstly constructed; a second storage yard processing site and a second temporary road are arranged on a top plate of the constructed underground structure, so that the first storage yard processing site is converted to the top plate of the constructed underground structure, earthwork excavated by the foundation pit unit after construction is transported outwards through the second temporary road, and the earthwork is transported outwards through the second temporary road at the position where the second temporary road is not overlapped with the fire-fighting road. And a beam plate of a top plate of the underground structure is reinforced. The problems that a trestle-free foundation pit is high in cost and long in construction period when a traditional foundation pit construction method is adopted are solved.
本发明公开了一种无栈桥基坑的地下室顶板施工道路及堆场加工场转换方法,包括:根据装配式住宅群的预售顺序,将无栈桥基坑划分为多个基坑单元;于后施工的基坑单元内设置第一堆场加工场和第一临时道路,于先施工的基坑单元依次开挖土方并将土方经由第一临时道路外运;施工先施工的基坑单元的地下结构;在已施工的地下结构的顶板上设置第二堆场加工场和第二临时道路,使得第一堆场加工场转换至已施工的地下结构的顶板上、后施工的基坑单元开挖的土方经由第二临时道路外运,在第二临时道路与消防道路不重合的位置,对地下结构的顶板的梁板进行加强。本发明解决了无栈桥基坑采用传统基坑施工方法存在成本高、施工工期长的问题。
Basement roof construction road and storage yard processing yard conversion method without trestle foundation pit
无栈桥基坑的地下室顶板施工道路及堆场加工场转换方法
LI TAISHENG (Autor:in) / XIANG GUANGXU (Autor:in) / ZHANG CHENGZHOU (Autor:in) / LIN MIN (Autor:in) / ZHAI YONGJUN (Autor:in) / WANG YONGJIN (Autor:in) / GAO JINGPING (Autor:in) / ZUO RENLIANG (Autor:in)
29.12.2023
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD
Europäisches Patentamt | 2024
|CONSTRUCTION METHOD FOR WATER BODY REPLACEMENT TYPE STORAGE YARD, AND STORAGE YARD
Europäisches Patentamt | 2025
|Stock yard roof film structure installation and construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Basement roof construction hoist foundation construction method
Europäisches Patentamt | 2023
|