Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated shear wall system and construction method
The invention relates to an assembly type shear wall system and a construction method. The assembly type shear wall system comprises a prefabricated shear wall body, a prefabricated floor slab and a beam component. The shear wall body comprises a prefabricated shear outer wall and a prefabricated shear inner wall, at least one end of the shear outer wall is integrally prefabricated to form a bent corner, the shear outer wall and the shear inner wall are connected and define an assembly space, and a heat preservation layer is arranged in the shear outer wall. The beam component and the floor are arranged in the assembly space, the two ends of the beam component are connected with the inner wall of the assembly space, a supporting structure located above the beam component is arranged on the inner wall of the assembly space, and the floor is located on the supporting structure and connected with the beam component. In this way, the prefabricated outer shear wall, the prefabricated inner shear wall and the prefabricated floor slabs are transported to the site and can be rapidly assembled, and compared with manufacturing in the construction site in the prior art, the fabricated shear wall system is high in construction progress and construction efficiency in site construction, and the site environmental pollution is small.
本公开涉及一种装配式剪力墙体系及施工方法,该装配式剪力墙体系包括预制的剪力墙本体、预制的楼板、梁构件;剪力墙本体包括预制的剪力外墙和预制的剪力内墙,剪力外墙的至少一端一体预制成型有折弯拐角,剪力外墙和剪力内墙连接并围合形成装配空间,剪力外墙内具有保温层;梁构件、楼板均设置在装配空间内,梁构件的两端分别与装配空间的内壁连接,装配空间的内壁上设置有位于梁构件上方的支撑结构,楼板位于支撑结构上并与梁构件连接。这样将预制好的剪力外墙、剪力内墙、楼板运输至现场即可快速组装,与现有技术中在施工现场制作相比,本公开的装配式剪力墙体系在现场施工的施工进度和施工效率较高,现场环境污染较小。
Fabricated shear wall system and construction method
The invention relates to an assembly type shear wall system and a construction method. The assembly type shear wall system comprises a prefabricated shear wall body, a prefabricated floor slab and a beam component. The shear wall body comprises a prefabricated shear outer wall and a prefabricated shear inner wall, at least one end of the shear outer wall is integrally prefabricated to form a bent corner, the shear outer wall and the shear inner wall are connected and define an assembly space, and a heat preservation layer is arranged in the shear outer wall. The beam component and the floor are arranged in the assembly space, the two ends of the beam component are connected with the inner wall of the assembly space, a supporting structure located above the beam component is arranged on the inner wall of the assembly space, and the floor is located on the supporting structure and connected with the beam component. In this way, the prefabricated outer shear wall, the prefabricated inner shear wall and the prefabricated floor slabs are transported to the site and can be rapidly assembled, and compared with manufacturing in the construction site in the prior art, the fabricated shear wall system is high in construction progress and construction efficiency in site construction, and the site environmental pollution is small.
本公开涉及一种装配式剪力墙体系及施工方法,该装配式剪力墙体系包括预制的剪力墙本体、预制的楼板、梁构件;剪力墙本体包括预制的剪力外墙和预制的剪力内墙,剪力外墙的至少一端一体预制成型有折弯拐角,剪力外墙和剪力内墙连接并围合形成装配空间,剪力外墙内具有保温层;梁构件、楼板均设置在装配空间内,梁构件的两端分别与装配空间的内壁连接,装配空间的内壁上设置有位于梁构件上方的支撑结构,楼板位于支撑结构上并与梁构件连接。这样将预制好的剪力外墙、剪力内墙、楼板运输至现场即可快速组装,与现有技术中在施工现场制作相比,本公开的装配式剪力墙体系在现场施工的施工进度和施工效率较高,现场环境污染较小。
Fabricated shear wall system and construction method
装配式剪力墙体系及施工方法
LIU XUECHUN (Autor:in) / WANG JING (Autor:in) / CHAI CHENGYUAN (Autor:in) / LYU BAOHUA (Autor:in) / CHEN XUESEN (Autor:in)
11.04.2023
Patent
Elektronische Ressource
Chinesisch
Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
Europäisches Patentamt | 2021
|Fabricated shear wall connecting mechanism, shear wall and shear wall construction method
Europäisches Patentamt | 2021
|Fabricated shear wall connecting mechanism and shear wall construction method
Europäisches Patentamt | 2024
|