Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Municipal bridge deck concrete slab laying device and method
The municipal bridge deck concrete slab laying device comprises a bottom plate and is characterized in that the bottom plate is fixedly connected with a set of first electric push rods, the push rod end of each first electric push rod is fixedly connected with a transverse plate, the transverse plates are provided with straight grooves, and first round rods are arranged in the straight grooves; the first round rod is fixedly connected with the transverse plate, the transverse plate is fixedly connected with the second round shaft, the transverse plate is fixedly connected with the power mechanism, and the round rod penetrates through the moving mechanism. The invention relates to the field of bridge laying equipment, in particular to a municipal bridge deck concrete slab laying device and method. The technical problem to be solved by the invention is to provide the municipal bridge deck concrete slab laying device and method, so that concrete slabs are convenient to lay.
本发明公开一种市政桥面混凝土板铺设装置及方法,包括底板,其特征在于:所述底板固定连接一组电动推杆一,每个所述电动推杆一的推杆端分别固定连接横板,所述横板设置有直槽,所述直槽内设置有圆杆一,所述圆杆一固定连接所述横板,所述横板固定连接圆轴二,所述横板固定连接动力机构,所述圆杆穿过移动机构。本发明涉及桥梁铺设设备领域,具体地讲,涉及一种市政桥面混凝土板铺设装置及方法。本发明要解决的技术问题是提供一种市政桥面混凝土板铺设装置及方法,方便混凝土板铺设。
Municipal bridge deck concrete slab laying device and method
The municipal bridge deck concrete slab laying device comprises a bottom plate and is characterized in that the bottom plate is fixedly connected with a set of first electric push rods, the push rod end of each first electric push rod is fixedly connected with a transverse plate, the transverse plates are provided with straight grooves, and first round rods are arranged in the straight grooves; the first round rod is fixedly connected with the transverse plate, the transverse plate is fixedly connected with the second round shaft, the transverse plate is fixedly connected with the power mechanism, and the round rod penetrates through the moving mechanism. The invention relates to the field of bridge laying equipment, in particular to a municipal bridge deck concrete slab laying device and method. The technical problem to be solved by the invention is to provide the municipal bridge deck concrete slab laying device and method, so that concrete slabs are convenient to lay.
本发明公开一种市政桥面混凝土板铺设装置及方法,包括底板,其特征在于:所述底板固定连接一组电动推杆一,每个所述电动推杆一的推杆端分别固定连接横板,所述横板设置有直槽,所述直槽内设置有圆杆一,所述圆杆一固定连接所述横板,所述横板固定连接圆轴二,所述横板固定连接动力机构,所述圆杆穿过移动机构。本发明涉及桥梁铺设设备领域,具体地讲,涉及一种市政桥面混凝土板铺设装置及方法。本发明要解决的技术问题是提供一种市政桥面混凝土板铺设装置及方法,方便混凝土板铺设。
Municipal bridge deck concrete slab laying device and method
一种市政桥面混凝土板铺设装置及方法
TENG ZHAOFEI (Autor:in) / ZHANG NAN (Autor:in) / MA ZHENXUE (Autor:in) / JANG BONG-SEOK (Autor:in) / XUE FEI (Autor:in) / LI LEI (Autor:in) / DANG XIANGFEI (Autor:in) / XUE WENHUA (Autor:in) / CHEN JIAN (Autor:in) / WANG YUYING (Autor:in)
14.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
CONSTRUCTION METHOD OF BRIDGE DECK SLAB ASSEMBLY FOR BRIDGE DECK SLAB AND BRIDGE DECK SLAB
Europäisches Patentamt | 2018
|Lifting device and laying method for cross-channel steel-concrete combined beam bridge deck slab
Europäisches Patentamt | 2023
|Bridge deck concrete laying oscillation equipment and laying method thereof
Europäisches Patentamt | 2020
|Construction method of bridge deck slab, bridge deck slab and bridge
Europäisches Patentamt | 2022
|