Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Steel bridge deck concrete laying device
The invention discloses a steel bridge deck concrete laying device, which relates to the technical field of concrete laying and comprises a device main body, a connecting arm is arranged on the side surface of the device main body, a moving wheel set is arranged at one end, far away from the device main body, of the connecting arm, a concrete hopper is arranged on the top surface of the device main body, and a conveying pipeline is arranged on the front surface of the device main body. The concrete hopper is communicated with the material conveying pipeline, the bottom face of the material conveying pipeline is connected with a plurality of discharging ports, and the concrete hopper conveys concrete to enable the material conveying pipeline to reciprocate in the horizontal transverse direction. In the moving process of the device body, concrete in the concrete hopper can enter the conveying pipeline and is finally discharged from the discharging port, laying of the steel bridge deck concrete is achieved, and due to the fact that the concrete hopper conveys the concrete to enable the conveying pipeline to make reciprocating motion in the horizontal transverse direction, when the concrete is sprayed at the discharging port, the concrete in the concrete hopper can be conveyed to the conveying pipeline, and laying of the steel bridge deck concrete is achieved. And a throwing effect can be generated, so that the concrete is paved more uniformly.
本发明公开了钢桥面混凝土铺设装置,涉及混凝土铺设技术领域,包括装置主体,装置主体的侧面设有连接臂,连接臂远离装置主体的一端设有移动轮组,在装置主体的顶面设置有混凝土料斗,在装置主体的正面设置有输料管道,混凝土料斗与输料管道相连通,输料管道的底面连接若干出料口,混凝土料斗通过输送混凝土使输料管道产生沿水平横向的往复移动;在装置主体移动的过程中,混凝土料斗中的混凝土会进入输料管道中,最后再从出料口排出,实现了钢桥面混凝土的铺设,由于混凝土料斗通过输送混凝土使输料管道产生沿水平横向的往复移动,所以在出料口喷洒混凝土时,会产生抛洒效果,使混凝土铺设的更加均匀。
Steel bridge deck concrete laying device
The invention discloses a steel bridge deck concrete laying device, which relates to the technical field of concrete laying and comprises a device main body, a connecting arm is arranged on the side surface of the device main body, a moving wheel set is arranged at one end, far away from the device main body, of the connecting arm, a concrete hopper is arranged on the top surface of the device main body, and a conveying pipeline is arranged on the front surface of the device main body. The concrete hopper is communicated with the material conveying pipeline, the bottom face of the material conveying pipeline is connected with a plurality of discharging ports, and the concrete hopper conveys concrete to enable the material conveying pipeline to reciprocate in the horizontal transverse direction. In the moving process of the device body, concrete in the concrete hopper can enter the conveying pipeline and is finally discharged from the discharging port, laying of the steel bridge deck concrete is achieved, and due to the fact that the concrete hopper conveys the concrete to enable the conveying pipeline to make reciprocating motion in the horizontal transverse direction, when the concrete is sprayed at the discharging port, the concrete in the concrete hopper can be conveyed to the conveying pipeline, and laying of the steel bridge deck concrete is achieved. And a throwing effect can be generated, so that the concrete is paved more uniformly.
本发明公开了钢桥面混凝土铺设装置,涉及混凝土铺设技术领域,包括装置主体,装置主体的侧面设有连接臂,连接臂远离装置主体的一端设有移动轮组,在装置主体的顶面设置有混凝土料斗,在装置主体的正面设置有输料管道,混凝土料斗与输料管道相连通,输料管道的底面连接若干出料口,混凝土料斗通过输送混凝土使输料管道产生沿水平横向的往复移动;在装置主体移动的过程中,混凝土料斗中的混凝土会进入输料管道中,最后再从出料口排出,实现了钢桥面混凝土的铺设,由于混凝土料斗通过输送混凝土使输料管道产生沿水平横向的往复移动,所以在出料口喷洒混凝土时,会产生抛洒效果,使混凝土铺设的更加均匀。
Steel bridge deck concrete laying device
钢桥面混凝土铺设装置
QIAN SHENCHUN (Autor:in) / XIA HUANHUAN (Autor:in) / LIU HAO (Autor:in) / LI WEICHAO (Autor:in) / WANG JIAN (Autor:in) / BAO CHENGZHI (Autor:in) / HU JINCHENG (Autor:in) / SHI SHANJIANG (Autor:in)
23.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Bridge deck concrete laying oscillation equipment and laying method thereof
Europäisches Patentamt | 2020
|Municipal bridge deck concrete slab laying device and method
Europäisches Patentamt | 2023
|Lifting device and laying method for cross-channel steel-concrete combined beam bridge deck slab
Europäisches Patentamt | 2023
|