Combined steel box shear wall and manufacturing process thereof
The invention relates to the field of construction and building materials, and discloses a combined steel box shear wall manufacturing process which comprises the following steps: S1, manufacturing box units, an upper panel and a lower panel; s2, milling the end of the reference surface; s3, an integral splicing platform is erected; s4, spot welding positioning; s5, assembling an inner partition plate and an upper panel; and S6, performing overall detection, correction and fixation. The invention further discloses the combined type steel box shear wall which is manufactured through the manufacturing process. Comprising a plurality of box body units and plate units used for connecting the box body units into a whole. The plate unit comprises an upper panel, a lower panel and an inner partition plate. The upper panel and the lower panel are fixed to the two ends of the adjacent box body units, the inner partition plate is arranged between the upper panel and the lower panel, and the two ends of the inner partition plate are fixedly connected with the upper panel and the lower panel respectively. According to the method, the manual assembling and welding workloads of teams and groups can be reduced, the manufacturing speed is increased, and the overall assembling size precision control is improved.
本发明涉及建筑建材领域,公开了一种组合式钢箱体剪力墙制作工艺,其包括以下步骤:S1、制作箱体单元、上面板和下面板;S2、基准面端铣;S3、搭设整体拼装平台;S4、点焊定位;S5、装配内隔板、上面板;S6、整体检测矫正并固定。本发明还公开了一种组合式钢箱体剪力墙,其采用上述的制作工艺制作而成。包括若干箱体单元和用于将箱体单元连接成一体的板件单元。板件单元包括上面板、下面板和内隔板。上面板和下面板固定于相邻箱体单元的两端,内隔板设置于上面板和下面板之间,且内隔板两端分别与上面板和下面板固定连接。本发明不仅能够减少班组人工组立、焊接工作量,提高制作速率,而且还提高了整体装配尺寸精度控制。
Combined steel box shear wall and manufacturing process thereof
The invention relates to the field of construction and building materials, and discloses a combined steel box shear wall manufacturing process which comprises the following steps: S1, manufacturing box units, an upper panel and a lower panel; s2, milling the end of the reference surface; s3, an integral splicing platform is erected; s4, spot welding positioning; s5, assembling an inner partition plate and an upper panel; and S6, performing overall detection, correction and fixation. The invention further discloses the combined type steel box shear wall which is manufactured through the manufacturing process. Comprising a plurality of box body units and plate units used for connecting the box body units into a whole. The plate unit comprises an upper panel, a lower panel and an inner partition plate. The upper panel and the lower panel are fixed to the two ends of the adjacent box body units, the inner partition plate is arranged between the upper panel and the lower panel, and the two ends of the inner partition plate are fixedly connected with the upper panel and the lower panel respectively. According to the method, the manual assembling and welding workloads of teams and groups can be reduced, the manufacturing speed is increased, and the overall assembling size precision control is improved.
本发明涉及建筑建材领域,公开了一种组合式钢箱体剪力墙制作工艺,其包括以下步骤:S1、制作箱体单元、上面板和下面板;S2、基准面端铣;S3、搭设整体拼装平台;S4、点焊定位;S5、装配内隔板、上面板;S6、整体检测矫正并固定。本发明还公开了一种组合式钢箱体剪力墙,其采用上述的制作工艺制作而成。包括若干箱体单元和用于将箱体单元连接成一体的板件单元。板件单元包括上面板、下面板和内隔板。上面板和下面板固定于相邻箱体单元的两端,内隔板设置于上面板和下面板之间,且内隔板两端分别与上面板和下面板固定连接。本发明不仅能够减少班组人工组立、焊接工作量,提高制作速率,而且还提高了整体装配尺寸精度控制。
Combined steel box shear wall and manufacturing process thereof
一种组合式钢箱体剪力墙及其制作工艺
JIANG XINPING (Autor:in)
14.04.2023
Patent
Elektronische Ressource
Chinesisch
Steel plate shear wall component and manufacturing process thereof
Europäisches Patentamt | 2023
|Steel plate shear wall unit and modular combined steel plate shear wall
Europäisches Patentamt | 2024
|Steel plate combined superposed shear wall and processing technology thereof
Europäisches Patentamt | 2020
|