Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Visual collaborative construction method for curtain wall
The invention relates to a curtain wall visual collaborative construction method, which belongs to the technical field of curtain wall construction, and comprises the following steps: S1, measuring and setting out a curtain wall stand column; s2, the bases are correspondingly installed at the corresponding positions on the ground through fixing assemblies; s3, the bottom ends of the stand columns are fixed to the corresponding bases; a coaming is fixed to the upper surface of the base, the bottom end of the stand column is inserted into the coaming, clamping plates horizontally slide on the two opposite sides of the stand column, a positioning mechanism used for pressing the clamping plates on the outer side of the coaming is arranged on the stand column, and a plurality of connecting pieces used for fixing the stand column and the clamping plates are arranged between the stand column and the clamping plates. S4, after the stand columns are installed, cross beams are installed; s5, curtain wall plates are installed; and S6, curtain wall cleaning and acceptance check are conducted. The curtain wall has the effect that the firmness degree between the stand column and the base is increased, so that the safety of the curtain wall is improved.
本申请涉及一种幕墙可视化协同施工方法,属于幕墙施工的技术领域,包括以下步骤:S1、幕墙立柱的测量放线;S2、各个底座通过固定组件对应安装到地面上对应位置;S3、将立柱底端固定到对应底座上;其中,底座上表面固定有围板,立柱底端插入围板内,立柱相对的两侧水平滑动有夹板,立柱上设有用于使夹板压紧在围板外侧的定位机构,立柱与夹板之间设有将两者固定的若干连接件;S4、立柱安装完毕后进行横梁的安装;S5、进行幕墙板块的安装;S6、幕墙清洁并验收。本申请具有增加立柱与底座之间的牢固程度,以提高幕墙安全性的效果。
Visual collaborative construction method for curtain wall
The invention relates to a curtain wall visual collaborative construction method, which belongs to the technical field of curtain wall construction, and comprises the following steps: S1, measuring and setting out a curtain wall stand column; s2, the bases are correspondingly installed at the corresponding positions on the ground through fixing assemblies; s3, the bottom ends of the stand columns are fixed to the corresponding bases; a coaming is fixed to the upper surface of the base, the bottom end of the stand column is inserted into the coaming, clamping plates horizontally slide on the two opposite sides of the stand column, a positioning mechanism used for pressing the clamping plates on the outer side of the coaming is arranged on the stand column, and a plurality of connecting pieces used for fixing the stand column and the clamping plates are arranged between the stand column and the clamping plates. S4, after the stand columns are installed, cross beams are installed; s5, curtain wall plates are installed; and S6, curtain wall cleaning and acceptance check are conducted. The curtain wall has the effect that the firmness degree between the stand column and the base is increased, so that the safety of the curtain wall is improved.
本申请涉及一种幕墙可视化协同施工方法,属于幕墙施工的技术领域,包括以下步骤:S1、幕墙立柱的测量放线;S2、各个底座通过固定组件对应安装到地面上对应位置;S3、将立柱底端固定到对应底座上;其中,底座上表面固定有围板,立柱底端插入围板内,立柱相对的两侧水平滑动有夹板,立柱上设有用于使夹板压紧在围板外侧的定位机构,立柱与夹板之间设有将两者固定的若干连接件;S4、立柱安装完毕后进行横梁的安装;S5、进行幕墙板块的安装;S6、幕墙清洁并验收。本申请具有增加立柱与底座之间的牢固程度,以提高幕墙安全性的效果。
Visual collaborative construction method for curtain wall
一种幕墙可视化协同施工方法
HUANG HANFENG (Autor:in) / GAO CHANGMING (Autor:in) / QIU GUANGJIAN (Autor:in) / ZHAO SHUJUN (Autor:in) / GUAN ZHANGWEI (Autor:in) / KAN GUANGZHI (Autor:in) / REN XUAN (Autor:in) / YUAN WEI (Autor:in) / LI WEI (Autor:in) / WANG TENGFEI (Autor:in)
21.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CONSTRUCTION METHOD FOR CURTAIN WALL AND CURTAIN WALL
Europäisches Patentamt | 2018
|Deformation collaborative construction method for asymmetric suspension body curtain wall
Europäisches Patentamt | 2023
|Curtain wall fixing device and curtain wall construction method
Europäisches Patentamt | 2022
|Steel curtain wall and steel curtain wall construction method
Europäisches Patentamt | 2018
|