Rock-fill dam monitoring system based on gravelly soil core wall for water conservancy project and construction method
The invention discloses a rock-fill dam monitoring system based on a gravelly soil core wall for a water conservancy project and a construction method, and relates to the technical field of water conservancy project construction, the rock-fill dam monitoring system comprises a data acquisition and processing terminal, and the construction method comprises the following steps: a control terminal connected with the data acquisition and processing terminal is used for acquiring a construction target task; the construction content and the construction duration are analyzed; analyzing climatic change and landform characteristics of the task attribution within the construction time limit; construction target task construction configuration is designed by referring to climate changes and landform characteristics in the construction time limit; a construction scheme is confirmed, construction machinery configuration content in the construction scheme is extracted, various configurations of construction machinery are detected, and a current time period constant point location in single-day task load configuration is confirmed; the method provided by the invention is used for rockfill dam construction of the gravelly soil core wall, and the method reduces the proportion of manual participation in the previous construction process, so that the construction process is more intelligent, and the construction cost is greatly reduced.
本发明公开了一种基于水利工程用砾石土心墙的堆石坝监控系统及施工方法,涉及水利工程施工技术领域,包含数据采集及处理终端,包括以下步骤:以及与所述数据采集及处理终端连接的控制终端,获取施工目标任务,分析施工内容及施工始终期限;分析任务归属地施工始终期限内气候变化及地貌特征;参考施工始终期限内气候变化及地貌特征设计施工目标任务施工配置;确认施工方案,提取施工方案中施工机械配置内容,对施工器械各项配置检测,确认单日任务量配置中当前时段始终点位;本发明提供一种方法用于砾石土心墙的堆石坝化施工,该方法降低了以往施工过程中人工参与的占比率,从而使得施工过程更加智能,其施工成本也因此大大降低。
Rock-fill dam monitoring system based on gravelly soil core wall for water conservancy project and construction method
The invention discloses a rock-fill dam monitoring system based on a gravelly soil core wall for a water conservancy project and a construction method, and relates to the technical field of water conservancy project construction, the rock-fill dam monitoring system comprises a data acquisition and processing terminal, and the construction method comprises the following steps: a control terminal connected with the data acquisition and processing terminal is used for acquiring a construction target task; the construction content and the construction duration are analyzed; analyzing climatic change and landform characteristics of the task attribution within the construction time limit; construction target task construction configuration is designed by referring to climate changes and landform characteristics in the construction time limit; a construction scheme is confirmed, construction machinery configuration content in the construction scheme is extracted, various configurations of construction machinery are detected, and a current time period constant point location in single-day task load configuration is confirmed; the method provided by the invention is used for rockfill dam construction of the gravelly soil core wall, and the method reduces the proportion of manual participation in the previous construction process, so that the construction process is more intelligent, and the construction cost is greatly reduced.
本发明公开了一种基于水利工程用砾石土心墙的堆石坝监控系统及施工方法,涉及水利工程施工技术领域,包含数据采集及处理终端,包括以下步骤:以及与所述数据采集及处理终端连接的控制终端,获取施工目标任务,分析施工内容及施工始终期限;分析任务归属地施工始终期限内气候变化及地貌特征;参考施工始终期限内气候变化及地貌特征设计施工目标任务施工配置;确认施工方案,提取施工方案中施工机械配置内容,对施工器械各项配置检测,确认单日任务量配置中当前时段始终点位;本发明提供一种方法用于砾石土心墙的堆石坝化施工,该方法降低了以往施工过程中人工参与的占比率,从而使得施工过程更加智能,其施工成本也因此大大降低。
Rock-fill dam monitoring system based on gravelly soil core wall for water conservancy project and construction method
基于水利工程用砾石土心墙的堆石坝监控系统及施工方法
LIU GUANGHUA (Autor:in) / LIAN XINJUN (Autor:in) / GAO YONGQIN (Autor:in) / ZHOU LONGJIE (Autor:in)
25.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
G06V
/
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
G06Q
Datenverarbeitungssysteme oder -verfahren, besonders angepasst an verwaltungstechnische, geschäftliche, finanzielle oder betriebswirtschaftliche Zwecke, sowie an geschäftsbezogene Überwachungs- oder Voraussagezwecke
,
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES
/
H04N
PICTORIAL COMMUNICATION, e.g. TELEVISION
,
Bildübertragung, z.B. Fernsehen
Europäisches Patentamt | 2023
|Water conservancy project retaining wall and construction method
Europäisches Patentamt | 2022
|Water conservancy project retaining wall and construction method
Europäisches Patentamt | 2015
|