Concrete rapid molding construction process
The invention relates to a concrete rapid molding construction process, which comprises the following steps of: A, placing a device in place: A1, placing a template fixing base in place; a2, template in-place preparation; a3, the template is in place; a4, placing a material distributing machine in place; b, concrete pouring and vibrating: B1, concrete conveying; b2, adjusting the proportion of an additive; b3, continuously using a material distributor to distribute materials; b4, concrete condensation; c, dismantling the material distributing machine and the template: C1, dismantling the material distributing machine; c2, separating the template; c3, the formwork fixing base is moved to enter the next section of construction; by means of the construction steps, pouring can be conducted once every 10 min, springback materials in concrete spraying construction are avoided, material waste is reduced, environmental pollution is reduced, energy consumption is reduced due to the fact that no high-pressure air exists, the flatness of formwork construction is good, and waterproof board paving in the next procedure is facilitated.
一种混凝土快速模筑施工工艺,由以下步骤组成:A、装置就位:A1、模板固定基座就位;A2、模板就位准备;A3、模板就位;A4、布料机就位;B、混凝土浇筑、振捣:B1、输送混凝土;B2、调试外加剂配比;B3、连续使用布料机布料;B4、混凝土凝结;C、布料机、模板拆除:C1、布料机拆除;C2、分离模板;C3、挪移模板固定基座进入下一段施工;采用本发明的施工步骤,每10min可进行浇筑一次,避免了喷射混凝土施工中回弹料的发生,降低材料浪费,减少了环境污染,并且没有高压风降低了能耗,模板施工的平整度也较好有利于下步工序防水板铺装。
Concrete rapid molding construction process
The invention relates to a concrete rapid molding construction process, which comprises the following steps of: A, placing a device in place: A1, placing a template fixing base in place; a2, template in-place preparation; a3, the template is in place; a4, placing a material distributing machine in place; b, concrete pouring and vibrating: B1, concrete conveying; b2, adjusting the proportion of an additive; b3, continuously using a material distributor to distribute materials; b4, concrete condensation; c, dismantling the material distributing machine and the template: C1, dismantling the material distributing machine; c2, separating the template; c3, the formwork fixing base is moved to enter the next section of construction; by means of the construction steps, pouring can be conducted once every 10 min, springback materials in concrete spraying construction are avoided, material waste is reduced, environmental pollution is reduced, energy consumption is reduced due to the fact that no high-pressure air exists, the flatness of formwork construction is good, and waterproof board paving in the next procedure is facilitated.
一种混凝土快速模筑施工工艺,由以下步骤组成:A、装置就位:A1、模板固定基座就位;A2、模板就位准备;A3、模板就位;A4、布料机就位;B、混凝土浇筑、振捣:B1、输送混凝土;B2、调试外加剂配比;B3、连续使用布料机布料;B4、混凝土凝结;C、布料机、模板拆除:C1、布料机拆除;C2、分离模板;C3、挪移模板固定基座进入下一段施工;采用本发明的施工步骤,每10min可进行浇筑一次,避免了喷射混凝土施工中回弹料的发生,降低材料浪费,减少了环境污染,并且没有高压风降低了能耗,模板施工的平整度也较好有利于下步工序防水板铺装。
Concrete rapid molding construction process
一种混凝土快速模筑施工工艺
28.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E21D
SHAFTS
,
Schächte
/
E02D
FOUNDATIONS
,
Gründungen
/
F04D
Strömungsarbeitsmaschinen
,
NON-POSITIVE-DISPLACEMENT PUMPS
/
F16M
Rahmen, Gehäuse oder Grundplatten von Kraftmaschinen oder anderen Maschinen oder von Apparaten, nicht auf eine besondere Art von Maschine oder Apparat eingeschränkt, die anderweitig vorgesehen ist
,
FRAMES, CASINGS, OR BEDS, OF ENGINES OR OTHER MACHINES OR APPARATUS, NOT SPECIFIC TO AN ENGINE, MACHINE, OR APPARATUS PROVIDED FOR ELSEWHERE
CONCRETE SECONDARY MOLDING PRODUCT AND CONSTRUCTION METHOD OF CONCRETE SECONDARY MOLDING PRODUCT
Europäisches Patentamt | 2021
|