High-altitude sunshade film and sunshade film hoisting construction method
The invention relates to a high-altitude sun-shading film and a sun-shading film hoisting construction method, and belongs to the technical field of sun-shading films, the high-altitude sun-shading film comprises a plurality of splicing films, the splicing films form a circular film after being spliced, and a gap matched with a steel structure is formed between every two adjacent splicing films. The high-altitude sunshade film is formed in the mode that the multiple splicing films are spliced, customization of the sunshade film, splicing gaps and steel framework through gaps are avoided, and the overall effect is achieved visually and impressionally; therefore, the installation technology is optimized, the construction mode that a steel framework is installed firstly and then the sunshade film is tensioned in a traditional technology is fundamentally solved, overall hoisting facilitates quality control of batch machining, meanwhile, the phenomenon that the installation period is long is avoided, and the sunshade film can be manufactured on site only by adopting a fixed mold to conduct tensioning manufacturing. And the overall progress of mounting and hoisting is accelerated.
本发明涉及一种高空遮阳膜及遮阳膜吊装施工方法,属于遮阳膜技术领域,高空遮阳膜包括多个拼接膜,拼接后组成圆形膜,相邻的拼接膜之间设有与钢结构相配合的间隙。本发明利用多块拼接膜拼接方式来组成高空遮阳膜,避免定制遮阳膜,拼接缝隙与钢骨架通缝,在视觉及观感上呈现出整体效果;从而优化安装工艺,从根本上解决了传统工艺先安装钢骨架再进行遮阳膜张拉的施工方式,整体吊装不仅方便批量加工的质量控制,同时也解决了传安装工期较长的现象,现场遮阳膜制作只需采用固定模具进行张拉制作;加快了安装与吊装的整体进度。
High-altitude sunshade film and sunshade film hoisting construction method
The invention relates to a high-altitude sun-shading film and a sun-shading film hoisting construction method, and belongs to the technical field of sun-shading films, the high-altitude sun-shading film comprises a plurality of splicing films, the splicing films form a circular film after being spliced, and a gap matched with a steel structure is formed between every two adjacent splicing films. The high-altitude sunshade film is formed in the mode that the multiple splicing films are spliced, customization of the sunshade film, splicing gaps and steel framework through gaps are avoided, and the overall effect is achieved visually and impressionally; therefore, the installation technology is optimized, the construction mode that a steel framework is installed firstly and then the sunshade film is tensioned in a traditional technology is fundamentally solved, overall hoisting facilitates quality control of batch machining, meanwhile, the phenomenon that the installation period is long is avoided, and the sunshade film can be manufactured on site only by adopting a fixed mold to conduct tensioning manufacturing. And the overall progress of mounting and hoisting is accelerated.
本发明涉及一种高空遮阳膜及遮阳膜吊装施工方法,属于遮阳膜技术领域,高空遮阳膜包括多个拼接膜,拼接后组成圆形膜,相邻的拼接膜之间设有与钢结构相配合的间隙。本发明利用多块拼接膜拼接方式来组成高空遮阳膜,避免定制遮阳膜,拼接缝隙与钢骨架通缝,在视觉及观感上呈现出整体效果;从而优化安装工艺,从根本上解决了传统工艺先安装钢骨架再进行遮阳膜张拉的施工方式,整体吊装不仅方便批量加工的质量控制,同时也解决了传安装工期较长的现象,现场遮阳膜制作只需采用固定模具进行张拉制作;加快了安装与吊装的整体进度。
High-altitude sunshade film and sunshade film hoisting construction method
一种高空遮阳膜及遮阳膜吊装施工方法
OU CHUANCHAO (Autor:in) / AO KAIYIN (Autor:in) / YU QIAOQIAO (Autor:in) / FEI KAN (Autor:in) / FENG JINGFANG (Autor:in)
12.05.2023
Patent
Elektronische Ressource
Chinesisch
High-altitude construction frame with sunshade function
Europäisches Patentamt | 2021
|SUNSHADE MEMBER, SUNSHADE UNIT, SUNSHADE BLOCK AND SUNSHADE
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2021
|SUNSHADE MEMBER, SUNSHADE UNIT, SUNSHADE BLOCK, AND SUNSHADE
Europäisches Patentamt | 2019
|