Spatial hyperbolic steel box girder bolt connection joint construction method
The invention relates to a method for constructing a bolt connection joint of a spatial hyperbolic steel box girder. The method comprises the steps that 1, a jig frame is erected; 2, assembling the steel box girder; 3, welding the steel box girder; 4, bolt connection joints are manufactured; and step 5, identifying the connecting plate. According to the construction method, it can be ensured that 100% of the perforation percent of pass can be achieved through on-site installation of bolt connection joints at the butt joint portions of the spatial hyperbolic steel box girder wallboards; furthermore, more than 75% of the area of the bolt connecting surface can be tightly attached, the plugging area does not exceed 25% when a 0.2 mm feeler gauge is used for checking, and the standard requirement is met.
本发明是一种空间双曲钢箱梁螺栓连接节点建造方法;步骤1、胎架搭设;步骤2、组装钢箱梁;步骤3、焊接钢箱梁;步骤4、螺栓连接节点制作;步骤5、连接板标识。本发明所提出的建造方法,可以确保空间双曲钢箱梁壁板对接部位的螺栓连接节点,现场安装能够实现100%穿孔合格率;进一步本方法还可以做到螺栓连接面处有75%以上面积紧贴,用0.2mm塞尺检查,塞入面积不超过25%,满足规范要求。
Spatial hyperbolic steel box girder bolt connection joint construction method
The invention relates to a method for constructing a bolt connection joint of a spatial hyperbolic steel box girder. The method comprises the steps that 1, a jig frame is erected; 2, assembling the steel box girder; 3, welding the steel box girder; 4, bolt connection joints are manufactured; and step 5, identifying the connecting plate. According to the construction method, it can be ensured that 100% of the perforation percent of pass can be achieved through on-site installation of bolt connection joints at the butt joint portions of the spatial hyperbolic steel box girder wallboards; furthermore, more than 75% of the area of the bolt connecting surface can be tightly attached, the plugging area does not exceed 25% when a 0.2 mm feeler gauge is used for checking, and the standard requirement is met.
本发明是一种空间双曲钢箱梁螺栓连接节点建造方法;步骤1、胎架搭设;步骤2、组装钢箱梁;步骤3、焊接钢箱梁;步骤4、螺栓连接节点制作;步骤5、连接板标识。本发明所提出的建造方法,可以确保空间双曲钢箱梁壁板对接部位的螺栓连接节点,现场安装能够实现100%穿孔合格率;进一步本方法还可以做到螺栓连接面处有75%以上面积紧贴,用0.2mm塞尺检查,塞入面积不超过25%,满足规范要求。
Spatial hyperbolic steel box girder bolt connection joint construction method
一种空间双曲钢箱梁螺栓连接节点建造方法
LENG NA (Autor:in) / ZHANG KUN (Autor:in) / ZENG FANBIN (Autor:in) / LIU HUI (Autor:in) / XING LEI (Autor:in)
16.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Hinge connection structure of steel box girder and steel box girder connection construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Cross-shaped steel rib column full-bolt rigid connection joint and construction method
Europäisches Patentamt | 2022
|Construction method for connection of steel concrete connection segment and steel box girder
Europäisches Patentamt | 2022
|