Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete cast-in-place box girder construction device and method
The invention belongs to the field of concrete cast-in-place box girders, and particularly relates to a concrete cast-in-place box girder construction device and method.The device comprises two supports, the tops of the two supports are slidably connected with a horizontally-arranged transverse rod, a sliding block is slidably arranged on the transverse rod, and a driving device used for driving the sliding block to slide is installed on one side of the sliding block; the other side of the concrete pouring pipe is connected with a height-adjustable output pipe through a clamping component, the output pipe is vertically arranged, the top of the output pipe is communicated with a concrete pouring pipe, and the concrete pouring pipe is used for injecting concrete into the output pipe, when the concrete pouring pipe is specifically implemented, automatic and continuous pouring is achieved, operation of workers is facilitated, and the labor intensity is reduced.
本发明属于混凝土现浇箱梁领域,具体涉及混凝土现浇箱梁施工装置及方法,该装置包括两个支架,两个所述支架的顶部可滑动的连接水平设置的横杆,所述横杆上可滑动的设置滑块,所述滑块一侧安装有用于驱动其滑动的驱动装置,其另外一侧通过卡紧部件连接可调高度的输出管,所述输出管竖直设置,其顶部连通混凝土浇筑管,用于注入混凝土到所述输出管内,本发明具体实施时,实现自动、连续地浇筑,方便工作人员操作,并且降低了劳动强度。
Concrete cast-in-place box girder construction device and method
The invention belongs to the field of concrete cast-in-place box girders, and particularly relates to a concrete cast-in-place box girder construction device and method.The device comprises two supports, the tops of the two supports are slidably connected with a horizontally-arranged transverse rod, a sliding block is slidably arranged on the transverse rod, and a driving device used for driving the sliding block to slide is installed on one side of the sliding block; the other side of the concrete pouring pipe is connected with a height-adjustable output pipe through a clamping component, the output pipe is vertically arranged, the top of the output pipe is communicated with a concrete pouring pipe, and the concrete pouring pipe is used for injecting concrete into the output pipe, when the concrete pouring pipe is specifically implemented, automatic and continuous pouring is achieved, operation of workers is facilitated, and the labor intensity is reduced.
本发明属于混凝土现浇箱梁领域,具体涉及混凝土现浇箱梁施工装置及方法,该装置包括两个支架,两个所述支架的顶部可滑动的连接水平设置的横杆,所述横杆上可滑动的设置滑块,所述滑块一侧安装有用于驱动其滑动的驱动装置,其另外一侧通过卡紧部件连接可调高度的输出管,所述输出管竖直设置,其顶部连通混凝土浇筑管,用于注入混凝土到所述输出管内,本发明具体实施时,实现自动、连续地浇筑,方便工作人员操作,并且降低了劳动强度。
Concrete cast-in-place box girder construction device and method
混凝土现浇箱梁施工装置及方法
CHENG XIAODONG (Autor:in) / YU HAITAO (Autor:in) / WANG SHAOWEI (Autor:in) / ZHU QIN (Autor:in) / LI BENFU (Autor:in) / ZHANG MINGMIN (Autor:in)
16.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Prestressed concrete box girder cast-in-place and girder falling construction method
Europäisches Patentamt | 2023
|Concrete pouring construction method of cast-in-place box girder
Europäisches Patentamt | 2020
|Cast-in-place prestressed concrete continuous box girder construction method
Europäisches Patentamt | 2020
|Cast-in-place box girder support system and cast-in-place box girder construction method
Europäisches Patentamt | 2024
|