Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Combined enclosure structure and construction method thereof
The invention discloses a combined type building envelope and a construction method thereof. The combined type building envelope comprises an existing pipeline, a fender post, a sheet-pile wall, a top beam and a pipeline supporting body. A vacant part is formed in the area, corresponding to the existing pipeline, of the fender post. The sheet-pile wall is connected to the fender post, and the sheet-pile wall blocks the vacant part. The top beam is supported on the fender posts and the pile-slab wall, and the fender posts and the board loading wall are connected and fixed through the top beam. The two ends of a pipeline supporting body are supported and erected at the positions, corresponding to the vacant parts, of the top beam respectively, and the pipeline supporting body suspends the existing pipeline. The combined enclosure structure can well solve the problems that the pipeline relocation and transformation process is difficult, the relocation and transformation risk is large and the like, the construction period and cost are controllable, and the pipe relocation construction risk and difficulty in the early stage of subway construction are reduced.
本申请公开一种组合式围护结构及其施工方法,组合式围护结构包括:既有管线、围护桩、桩板墙、冠梁和管线支撑体。围护桩对应所述既有管线的区域形成空缺部。桩板墙连接于所述围护桩,且所述桩板墙封堵所述空缺部。冠梁支撑于所述围护桩和桩板墙上,所述冠梁将所述围护桩和装板墙连接固定。管线支撑体两端分别支撑于架设于所述冠梁对应所述空缺部的位置,所述管线支撑体悬吊所述既有管线。本申请的组合式围护结构可以很好解决管线迁改过程困难,迁改风险较大等问题,且施工工期和成本也可控,降低地铁施工前期管迁施工风险及难度。
Combined enclosure structure and construction method thereof
The invention discloses a combined type building envelope and a construction method thereof. The combined type building envelope comprises an existing pipeline, a fender post, a sheet-pile wall, a top beam and a pipeline supporting body. A vacant part is formed in the area, corresponding to the existing pipeline, of the fender post. The sheet-pile wall is connected to the fender post, and the sheet-pile wall blocks the vacant part. The top beam is supported on the fender posts and the pile-slab wall, and the fender posts and the board loading wall are connected and fixed through the top beam. The two ends of a pipeline supporting body are supported and erected at the positions, corresponding to the vacant parts, of the top beam respectively, and the pipeline supporting body suspends the existing pipeline. The combined enclosure structure can well solve the problems that the pipeline relocation and transformation process is difficult, the relocation and transformation risk is large and the like, the construction period and cost are controllable, and the pipe relocation construction risk and difficulty in the early stage of subway construction are reduced.
本申请公开一种组合式围护结构及其施工方法,组合式围护结构包括:既有管线、围护桩、桩板墙、冠梁和管线支撑体。围护桩对应所述既有管线的区域形成空缺部。桩板墙连接于所述围护桩,且所述桩板墙封堵所述空缺部。冠梁支撑于所述围护桩和桩板墙上,所述冠梁将所述围护桩和装板墙连接固定。管线支撑体两端分别支撑于架设于所述冠梁对应所述空缺部的位置,所述管线支撑体悬吊所述既有管线。本申请的组合式围护结构可以很好解决管线迁改过程困难,迁改风险较大等问题,且施工工期和成本也可控,降低地铁施工前期管迁施工风险及难度。
Combined enclosure structure and construction method thereof
一种组合式围护结构及其施工方法
HAN CHI (Autor:in) / WANG XIAOFEI (Autor:in) / LYU KE (Autor:in) / CHENG LIN (Autor:in) / CHEN ZHENG (Autor:in) / YANG WENCHAO (Autor:in) / SUN WEISHUAI (Autor:in) / WANG LEILEI (Autor:in) / WANG XIAOHAI (Autor:in) / LEI QINGLIN (Autor:in)
23.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Double-row PC construction method combined pile enclosure structure and construction method thereof
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Construction enclosure device and enclosure method thereof
Europäisches Patentamt | 2023
|Novel combined drip-irrigation ecological enclosure and construction method thereof
Europäisches Patentamt | 2020
|Combined steel sheet pile gravity type enclosure wall structure and construction method thereof
Europäisches Patentamt | 2022
|