Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Precast slab plugging device for track panel well
The invention provides a track panel well prefabricated slab plugging device, and relates to the field of track traffic construction, the track panel well prefabricated slab plugging device comprises a tunnel middle plate, the tunnel middle plate is arranged on the middle side in a tunnel, a middle partition wall is arranged on the middle side of the bottom end face in the tunnel, and scaffolds are erected on the bottom end face in the tunnel and located on the left side and the right side of the middle partition wall; prefabricated middle plates are evenly placed in the track hoisting well mouth on the tunnel middle plate, and the upper portions of the left side and the right side of each prefabricated middle plate are each connected with a reinforcing steel bar in an inserted mode. Through the arrangement of the prefabricated middle plate, the prefabricated middle plate can be prefabricated in advance, so that favorable conditions are created for construction of an overhead line system, a cable bridge and the like of a negative second layer, the shutdown waiting time is greatly shortened, and the engineering construction speed is greatly increased; the problem that when a traditional cast-in-place reinforced concrete blocking structure is constructed, due to the fact that in the process of waiting for complete solidification of the cast-in-place reinforced concrete blocking structure, shutdown waiting is needed, and the engineering construction speed is affected is solved.
本发明提供一种轨排井预制板封堵装置,涉及轨道交通建设领域,包括:隧道中板,所述隧道中板设置在隧道内部中侧,且隧道内部底端面中侧设置有中隔墙,并且隧道内部底端面位于中隔墙左右两侧均搭设有脚手架;所述隧道中板上的轨道吊装井口内部呈均匀状放置有预制中板,且预制中板左右两侧上部均插接有一根加强钢筋;本发明通过预制中板的设置,能够提前将预制中板进行预制,从而为负二层的接触网、电缆桥架等施工创造有利条件,从而大大缩短了停工等待的时间,从而大大提高了工程建设速度;解决了传统现浇钢筋混凝土封堵结构在施工时,由于在等待现浇钢筋混凝土封堵结构完全凝固的过程中,需要停工等待,从而影响工程建设速度的问题。
Precast slab plugging device for track panel well
The invention provides a track panel well prefabricated slab plugging device, and relates to the field of track traffic construction, the track panel well prefabricated slab plugging device comprises a tunnel middle plate, the tunnel middle plate is arranged on the middle side in a tunnel, a middle partition wall is arranged on the middle side of the bottom end face in the tunnel, and scaffolds are erected on the bottom end face in the tunnel and located on the left side and the right side of the middle partition wall; prefabricated middle plates are evenly placed in the track hoisting well mouth on the tunnel middle plate, and the upper portions of the left side and the right side of each prefabricated middle plate are each connected with a reinforcing steel bar in an inserted mode. Through the arrangement of the prefabricated middle plate, the prefabricated middle plate can be prefabricated in advance, so that favorable conditions are created for construction of an overhead line system, a cable bridge and the like of a negative second layer, the shutdown waiting time is greatly shortened, and the engineering construction speed is greatly increased; the problem that when a traditional cast-in-place reinforced concrete blocking structure is constructed, due to the fact that in the process of waiting for complete solidification of the cast-in-place reinforced concrete blocking structure, shutdown waiting is needed, and the engineering construction speed is affected is solved.
本发明提供一种轨排井预制板封堵装置,涉及轨道交通建设领域,包括:隧道中板,所述隧道中板设置在隧道内部中侧,且隧道内部底端面中侧设置有中隔墙,并且隧道内部底端面位于中隔墙左右两侧均搭设有脚手架;所述隧道中板上的轨道吊装井口内部呈均匀状放置有预制中板,且预制中板左右两侧上部均插接有一根加强钢筋;本发明通过预制中板的设置,能够提前将预制中板进行预制,从而为负二层的接触网、电缆桥架等施工创造有利条件,从而大大缩短了停工等待的时间,从而大大提高了工程建设速度;解决了传统现浇钢筋混凝土封堵结构在施工时,由于在等待现浇钢筋混凝土封堵结构完全凝固的过程中,需要停工等待,从而影响工程建设速度的问题。
Precast slab plugging device for track panel well
一种轨排井预制板封堵装置
LI LIANGTAO (Autor:in) / ZHU YILONG (Autor:in) / YUE CHANGGENG (Autor:in) / JIA MINGJIE (Autor:in) / WU PENGFEI (Autor:in) / WANG HAITING (Autor:in) / MIAO WEI (Autor:in) / WANG XUDONG (Autor:in) / WANG HUI (Autor:in) / LI YONGMING (Autor:in)
23.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
ADJUSTING DEVICE OF PRECAST PANEL IN RAILROAD PRECAST SLAB TRACK
Europäisches Patentamt | 2024
ADJUSTING DEVICE OF PRECAST PANEL IN RAILROAD PRECAST SLAB TRACK
Europäisches Patentamt | 2023
|Z Railway track using Z-shaped precast concrete slab panel
Europäisches Patentamt | 2016
Z Z-shaped precast concrete slab panel for rail track and railway track using the slab
Europäisches Patentamt | 2016
|