Concrete stand column detection method
The invention relates to a concrete stand column detection method which comprises the following steps: 1, building a foundation; secondly, the first section of the concrete stand column body is built; 3, constructing a surface layer of the first section of the upright post; fourthly, a concrete stand column body heightening section is built; 5, building a surface layer of a heightened section of the upright post; and the fourth step and the fifth step are repeated to complete construction of the remaining part of the concrete stand column. According to the concrete stand column detection method, the stand column body and detection are completed synchronously, and the problem that the construction period is long due to the fact that detection and pouring of an existing concrete stand column are completed in a staggered mode is solved.
本发明涉及一种混凝土立柱检测方法,第一步、建造基础;第二步、建造混凝土立柱本体首段;第三步、建造立柱首段表层;第四步、建造混凝土立柱本体加高段;第五步、建造立柱加高段表层;重复第四步和第五步完成混凝土立柱余下部分的建造。本发明旨在提供一种立柱本体和检测同步完成的混凝土立柱检测方法,解决了现有的混凝土立柱检测和浇筑错时完成导致的施工周期长的问题。
Concrete stand column detection method
The invention relates to a concrete stand column detection method which comprises the following steps: 1, building a foundation; secondly, the first section of the concrete stand column body is built; 3, constructing a surface layer of the first section of the upright post; fourthly, a concrete stand column body heightening section is built; 5, building a surface layer of a heightened section of the upright post; and the fourth step and the fifth step are repeated to complete construction of the remaining part of the concrete stand column. According to the concrete stand column detection method, the stand column body and detection are completed synchronously, and the problem that the construction period is long due to the fact that detection and pouring of an existing concrete stand column are completed in a staggered mode is solved.
本发明涉及一种混凝土立柱检测方法,第一步、建造基础;第二步、建造混凝土立柱本体首段;第三步、建造立柱首段表层;第四步、建造混凝土立柱本体加高段;第五步、建造立柱加高段表层;重复第四步和第五步完成混凝土立柱余下部分的建造。本发明旨在提供一种立柱本体和检测同步完成的混凝土立柱检测方法,解决了现有的混凝土立柱检测和浇筑错时完成导致的施工周期长的问题。
Concrete stand column detection method
一种混凝土立柱检测方法
JIANG YU (Autor:in) / LI HAIHAN (Autor:in) / XIAO KAIFENG (Autor:in) / WU BINGJIAN (Autor:in) / ZHUANG QINQI (Autor:in) / TANG DINGDONG (Autor:in) / WANG JIASHENG (Autor:in) / YANG YANG (Autor:in) / CHENG RONGLU (Autor:in) / ZHAN SHUANGHUA (Autor:in)
26.05.2023
Patent
Elektronische Ressource
Chinesisch
Automatic maintenance device for concrete stand column
Europäisches Patentamt | 2023
|