Steel pipe pile guide hole construction method under deepwater bare rock geological condition
The invention discloses a steel pipe pile guide hole construction method under a deepwater bare rock geological condition, which is applied to the technical field of deepwater engineering construction, and mainly comprises the following steps: S0, modeling by adopting finite element software, and carrying out construction safety verification; s1, the small-size steel pipe is positioned and installed firstly, and then preliminary fixing is conducted in the mode that the small-size steel pipe is sleeved with the steel pipe pile; s2, the steel pipe piles are vibrated and fixed, hole guiding is conducted on the steel pipe piles towards the deep water bed bottom, and then vibration fixing is conducted; s3, performing a tensile test on two adjacent steel pipe piles to obtain a horizontal load-displacement curve of the steel pipe piles and ensure the horizontal load resistance of the steel pipe piles when the hole guiding effect needs to be checked; according to the method, steel pipe pile hole guiding can be efficiently achieved, the steel pipe pile inserting and driving difficulty is reduced, installation is stable, and a series of problems of complicated construction procedures, long construction period, serious environmental pollution, high cost and the like of a traditional construction technology are effectively solved.
本发明公开了深水裸岩地质条件下钢管桩引孔施工方法,应用于深水工程施工技术领域,该方法主要包括:S0、采用有限元软件建模,并进行施工安全性验证;S1、先定位安装小尺寸钢管,再以钢管桩套在小尺寸钢管外的方式初步固定;S2、对钢管桩进行振捣固定,先在钢管桩内向深水床底进行引孔,再振捣固定;在需检查引孔效果时进行S3、对相邻两根钢管桩进行抗拉试验,得到钢管桩的水平荷载‑位移曲线,确保钢管桩的抗水平荷载能力;该方法能够高效实现钢管桩引孔,降低钢管桩插打难度,安装稳固,有效解决了传统施工工艺存在施工工序繁杂、施工工期长、环境污染大、成本高等一系列问题。
Steel pipe pile guide hole construction method under deepwater bare rock geological condition
The invention discloses a steel pipe pile guide hole construction method under a deepwater bare rock geological condition, which is applied to the technical field of deepwater engineering construction, and mainly comprises the following steps: S0, modeling by adopting finite element software, and carrying out construction safety verification; s1, the small-size steel pipe is positioned and installed firstly, and then preliminary fixing is conducted in the mode that the small-size steel pipe is sleeved with the steel pipe pile; s2, the steel pipe piles are vibrated and fixed, hole guiding is conducted on the steel pipe piles towards the deep water bed bottom, and then vibration fixing is conducted; s3, performing a tensile test on two adjacent steel pipe piles to obtain a horizontal load-displacement curve of the steel pipe piles and ensure the horizontal load resistance of the steel pipe piles when the hole guiding effect needs to be checked; according to the method, steel pipe pile hole guiding can be efficiently achieved, the steel pipe pile inserting and driving difficulty is reduced, installation is stable, and a series of problems of complicated construction procedures, long construction period, serious environmental pollution, high cost and the like of a traditional construction technology are effectively solved.
本发明公开了深水裸岩地质条件下钢管桩引孔施工方法,应用于深水工程施工技术领域,该方法主要包括:S0、采用有限元软件建模,并进行施工安全性验证;S1、先定位安装小尺寸钢管,再以钢管桩套在小尺寸钢管外的方式初步固定;S2、对钢管桩进行振捣固定,先在钢管桩内向深水床底进行引孔,再振捣固定;在需检查引孔效果时进行S3、对相邻两根钢管桩进行抗拉试验,得到钢管桩的水平荷载‑位移曲线,确保钢管桩的抗水平荷载能力;该方法能够高效实现钢管桩引孔,降低钢管桩插打难度,安装稳固,有效解决了传统施工工艺存在施工工序繁杂、施工工期长、环境污染大、成本高等一系列问题。
Steel pipe pile guide hole construction method under deepwater bare rock geological condition
深水裸岩地质条件下钢管桩引孔施工方法
ZHENG JIAN (Autor:in) / JIANG GANYOU (Autor:in) / YANG MINGQIN (Autor:in) / LI SHENZHE (Autor:in) / HUANG KAIKE (Autor:in) / CAO YANG (Autor:in) / CHEN SONGSONG (Autor:in) / MA LANJIN (Autor:in) / LI YUBIN (Autor:in) / QIN HAO (Autor:in)
26.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Steel pipe pile construction method for deepwater slope bare rock
Europäisches Patentamt | 2024
|Pile foundation steel casing construction method under bare rock geological condition
Europäisches Patentamt | 2024
|Steel pipe pile deepwater guide hole pile sinking construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|