Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention belongs to the technical field of building assembly, and discloses an energy-saving building assembly type wall and an assembly method.The energy-saving building assembly type wall comprises an assembly assembly, and the assembly assembly comprises a first assembly part and a second assembly part; third assembly parts are placed on the side, close to the second assembly part, of the first assembly part and the two ends in the length direction of the first assembly part correspondingly, and fourth assembly parts are placed on the side, close to the first assembly part, of the second assembly part and the two ends in the length direction of the second assembly part correspondingly; and fifth assembly parts are arranged between the third assembly parts and the adjacent fourth assembly parts. The first assembly part, the second assembly part, the two third assembly parts, the two fourth assembly parts and the two fifth assembly parts are arranged to form four wall bodies of the building, and in consideration of the requirement for different sizes of the interior of the assembled building, the length of the building is increased through the third assembly parts and the fourth assembly parts; in addition, the number of the third assembly parts and the number of the fourth assembly parts are both two, and the length range of the building is further expanded.
本公开属于建筑装配技术领域,公开一种节能建筑装配式墙体及装配方法,包括装配组件,装配组件包括第一装配件、第二装配件;第一装配件靠近第二装配件的一侧且沿第一装配件长度方向的两端分别放置有第三装配件,第二装配件靠近第一装配件的一侧且沿第二装配件长度方向的两端分别放置有第四装配件;第三装配件与相邻第四装配件之间皆放置有第五装配件。本公开设置第一装配件、第二装配件、两个第三装配件、两个第四装配件、两个第五装配件组成建筑的四面墙体,而考虑到对装配后的建筑其内部大小不一的需求,由第三装配件、第四装配件扩大此建筑的长度;此外,第三装配件、第四装配件皆为两个,进一步扩大此建筑的长度范围。
The invention belongs to the technical field of building assembly, and discloses an energy-saving building assembly type wall and an assembly method.The energy-saving building assembly type wall comprises an assembly assembly, and the assembly assembly comprises a first assembly part and a second assembly part; third assembly parts are placed on the side, close to the second assembly part, of the first assembly part and the two ends in the length direction of the first assembly part correspondingly, and fourth assembly parts are placed on the side, close to the first assembly part, of the second assembly part and the two ends in the length direction of the second assembly part correspondingly; and fifth assembly parts are arranged between the third assembly parts and the adjacent fourth assembly parts. The first assembly part, the second assembly part, the two third assembly parts, the two fourth assembly parts and the two fifth assembly parts are arranged to form four wall bodies of the building, and in consideration of the requirement for different sizes of the interior of the assembled building, the length of the building is increased through the third assembly parts and the fourth assembly parts; in addition, the number of the third assembly parts and the number of the fourth assembly parts are both two, and the length range of the building is further expanded.
本公开属于建筑装配技术领域,公开一种节能建筑装配式墙体及装配方法,包括装配组件,装配组件包括第一装配件、第二装配件;第一装配件靠近第二装配件的一侧且沿第一装配件长度方向的两端分别放置有第三装配件,第二装配件靠近第一装配件的一侧且沿第二装配件长度方向的两端分别放置有第四装配件;第三装配件与相邻第四装配件之间皆放置有第五装配件。本公开设置第一装配件、第二装配件、两个第三装配件、两个第四装配件、两个第五装配件组成建筑的四面墙体,而考虑到对装配后的建筑其内部大小不一的需求,由第三装配件、第四装配件扩大此建筑的长度;此外,第三装配件、第四装配件皆为两个,进一步扩大此建筑的长度范围。
Energy-saving building fabricated wall and assembly method
一种节能建筑装配式墙体及装配方法
GAO DI (Autor:in)
26.05.2023
Patent
Elektronische Ressource
Chinesisch
Energy-saving building fabricated wall and assembly method
Europäisches Patentamt | 2023
|Energy-saving fabricated building wall and assembly method thereof
Europäisches Patentamt | 2023
|Green energy-saving fabricated building wall and assembly method
Europäisches Patentamt | 2023
|