Roof double-layer steel grating structure and construction method thereof
The roof double-layer steel grating structure comprises an upper-layer steel grating, a hanging rod and a lower-layer steel grating, a fixing plate is fixed to the lower end of the hanging rod, and fixing assemblies facilitating rapid fixing of the lower-layer steel grating are arranged on the two sides of the fixing plate correspondingly; the fixing assembly comprises a fixing rod fixed to the side wall of the fixing plate, a positioning pull rod arranged on the fixing rod in a penetrating mode and connected with the fixing rod in a sliding mode, a baffle fixed to one end of the positioning pull rod and a first spring arranged on the positioning pull rod in a sleeving mode, and the two ends of the first spring are fixed to the fixing rod and the baffle correspondingly. Receding slopes are arranged at the ends, close to each other, of the positioning tow bars on the two sides, and the bottom face of the fixing plate, the two positioning tow bars and the two fixing rods are matched to fix the lower-layer steel grating. The mode that multiple sets of bolts are used for fixing in the prior art is changed, and the efficiency of installing the lower-layer steel grating by workers is improved.
本申请公开了一种屋面双层钢格栅结构及其施工方法,包括上层钢格栅、吊杆及下层钢格栅,吊杆下端固定有固定板,固定板两侧均设置有便于快速固定下层钢格栅的固定组件,固定组件包括与固定板侧壁固定的固定杆、贯穿设置于固定杆上并与固定杆滑移连接的定位拖杆、与定位拖杆一端固定的挡板以及套设于定位拖杆上的第一弹簧,第一弹簧两端分别与固定杆和挡板固定,两侧的定位拖杆相互靠近的一端均设置有让位斜面,固定板底面、两个定位拖杆以及两个固定杆配合并固定下层钢格栅。本申请改变了传统技术中使用多组螺栓进行固定的方式,提高了工作人员安装下层钢格栅的效率。
Roof double-layer steel grating structure and construction method thereof
The roof double-layer steel grating structure comprises an upper-layer steel grating, a hanging rod and a lower-layer steel grating, a fixing plate is fixed to the lower end of the hanging rod, and fixing assemblies facilitating rapid fixing of the lower-layer steel grating are arranged on the two sides of the fixing plate correspondingly; the fixing assembly comprises a fixing rod fixed to the side wall of the fixing plate, a positioning pull rod arranged on the fixing rod in a penetrating mode and connected with the fixing rod in a sliding mode, a baffle fixed to one end of the positioning pull rod and a first spring arranged on the positioning pull rod in a sleeving mode, and the two ends of the first spring are fixed to the fixing rod and the baffle correspondingly. Receding slopes are arranged at the ends, close to each other, of the positioning tow bars on the two sides, and the bottom face of the fixing plate, the two positioning tow bars and the two fixing rods are matched to fix the lower-layer steel grating. The mode that multiple sets of bolts are used for fixing in the prior art is changed, and the efficiency of installing the lower-layer steel grating by workers is improved.
本申请公开了一种屋面双层钢格栅结构及其施工方法,包括上层钢格栅、吊杆及下层钢格栅,吊杆下端固定有固定板,固定板两侧均设置有便于快速固定下层钢格栅的固定组件,固定组件包括与固定板侧壁固定的固定杆、贯穿设置于固定杆上并与固定杆滑移连接的定位拖杆、与定位拖杆一端固定的挡板以及套设于定位拖杆上的第一弹簧,第一弹簧两端分别与固定杆和挡板固定,两侧的定位拖杆相互靠近的一端均设置有让位斜面,固定板底面、两个定位拖杆以及两个固定杆配合并固定下层钢格栅。本申请改变了传统技术中使用多组螺栓进行固定的方式,提高了工作人员安装下层钢格栅的效率。
Roof double-layer steel grating structure and construction method thereof
一种屋面双层钢格栅结构及其施工方法
GAO QIAN (Autor:in) / LIU JIAYIN (Autor:in) / LIU FEI (Autor:in) / ZHU YIXIN (Autor:in) / WANG CHENGCAI (Autor:in) / JIAO DAOWEI (Autor:in) / JIANG LU (Autor:in) / XU RENHAO (Autor:in) / CHE CHANGYUAN (Autor:in) / WU WEI (Autor:in)
02.06.2023
Patent
Elektronische Ressource
Chinesisch
Engaging double-layer stainless steel metal roof structure and construction method thereof
Europäisches Patentamt | 2024
|Double-layer metal roof structure and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2015
|Construction method of double-layer roof curtain wall structure
Europäisches Patentamt | 2021
|