Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile-column integrated structure and vertical reinforcing sleeve pile and construction method thereof
The invention provides a pile-column integrated structure and a vertical reinforcing sleeve pile and a construction method thereof, the vertical reinforcing sleeve pile of the pile-column integrated structure comprises a telescopic sleeve pile body, the sleeve pile body comprises a plurality of sleeve pile single bodies which are sequentially nested, and the plurality of sleeve pile single bodies which are nested together can be pulled open to form long rods which are fixedly connected end to end. The vertical reinforcing sleeve pile with the pile-column integrated structure has the advantages of construction simplification and bending and shearing resistance.
本发明提供一种桩柱一体化结构及其竖向加强套桩和施工方法,桩柱一体化结构的竖向加强套桩包括能伸缩的套桩本体,套桩本体包括多个依次嵌套的套桩单体,嵌套在一起的多个套桩单体能拉开形成首尾固定连接的长杆。上述桩柱一体化结构的竖向加强套桩能兼顾简化施工与抗弯抗剪性能。
Pile-column integrated structure and vertical reinforcing sleeve pile and construction method thereof
The invention provides a pile-column integrated structure and a vertical reinforcing sleeve pile and a construction method thereof, the vertical reinforcing sleeve pile of the pile-column integrated structure comprises a telescopic sleeve pile body, the sleeve pile body comprises a plurality of sleeve pile single bodies which are sequentially nested, and the plurality of sleeve pile single bodies which are nested together can be pulled open to form long rods which are fixedly connected end to end. The vertical reinforcing sleeve pile with the pile-column integrated structure has the advantages of construction simplification and bending and shearing resistance.
本发明提供一种桩柱一体化结构及其竖向加强套桩和施工方法,桩柱一体化结构的竖向加强套桩包括能伸缩的套桩本体,套桩本体包括多个依次嵌套的套桩单体,嵌套在一起的多个套桩单体能拉开形成首尾固定连接的长杆。上述桩柱一体化结构的竖向加强套桩能兼顾简化施工与抗弯抗剪性能。
Pile-column integrated structure and vertical reinforcing sleeve pile and construction method thereof
桩柱一体化结构及其竖向加强套桩和施工方法
ZHANG CHI (Autor:in) / ZHANG YI (Autor:in) / ZHU ZHONGPING (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Vertical column pile system and construction method thereof
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|