Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process for water stop ridge below threshold stone
The invention relates to the technical field of indoor waterproof construction, and discloses a construction process of a water stop sill below a threshold stone, which comprises the following steps: S1, pouring a water stop sill core; s2, prefabricating a water stop sleeve ridge; s3, rough surface treatment; s4, the water stop sleeve ridge is hoisted; s5, waterproof layer treatment; and S6, mounting the threshold stone. According to the method, the water stop sill core and the floorboard are formed through one-time pouring, the anchor steel bars are pre-buried before pouring, the water stop sleeve sill is prefabricated through a factory, the water stop sleeve sill, the water stop sill core and the floorboard are installed together, and the water stop sill core and the floorboard are fixedly connected together through the anchor steel bars. By means of the construction technology, the position and the structural size precision of the water stop ridge can be guaranteed, the waterproof capacity of the water stop ridge platform is greatly improved, meanwhile, the manufacturing and installing efficiency is high, and the working efficiency of workers is improved.
本发明涉及室内防水施工技术领域,公开了一种过门石下方止水坎施工工艺,包括以下步骤:S1、止水坎芯浇筑;S2、止水套坎预制;S3、粗糙面处理;S4、止水套坎吊装;S5、防水层处理;S6、过门石安装。本发明通过将止水坎芯与楼面板一次浇筑成形,并在浇筑前预埋地脚钢筋,通过工厂预制止水套坎,并将止水套坎与止水坎芯与楼面板安装在一起,并通过地脚钢筋与止水套坎固结在一起,再进行水泥砂浆防水基层、防水层、水泥砂浆防水保护层、卫生间面层、室内面层以及过门石的施工,该施工工艺不仅可以确保止水坎位置及结构尺寸精度,且大大提高了止水坎台的防水能力,同时制作和安装效率高,提高工人的工作效率。
Construction process for water stop ridge below threshold stone
The invention relates to the technical field of indoor waterproof construction, and discloses a construction process of a water stop sill below a threshold stone, which comprises the following steps: S1, pouring a water stop sill core; s2, prefabricating a water stop sleeve ridge; s3, rough surface treatment; s4, the water stop sleeve ridge is hoisted; s5, waterproof layer treatment; and S6, mounting the threshold stone. According to the method, the water stop sill core and the floorboard are formed through one-time pouring, the anchor steel bars are pre-buried before pouring, the water stop sleeve sill is prefabricated through a factory, the water stop sleeve sill, the water stop sill core and the floorboard are installed together, and the water stop sill core and the floorboard are fixedly connected together through the anchor steel bars. By means of the construction technology, the position and the structural size precision of the water stop ridge can be guaranteed, the waterproof capacity of the water stop ridge platform is greatly improved, meanwhile, the manufacturing and installing efficiency is high, and the working efficiency of workers is improved.
本发明涉及室内防水施工技术领域,公开了一种过门石下方止水坎施工工艺,包括以下步骤:S1、止水坎芯浇筑;S2、止水套坎预制;S3、粗糙面处理;S4、止水套坎吊装;S5、防水层处理;S6、过门石安装。本发明通过将止水坎芯与楼面板一次浇筑成形,并在浇筑前预埋地脚钢筋,通过工厂预制止水套坎,并将止水套坎与止水坎芯与楼面板安装在一起,并通过地脚钢筋与止水套坎固结在一起,再进行水泥砂浆防水基层、防水层、水泥砂浆防水保护层、卫生间面层、室内面层以及过门石的施工,该施工工艺不仅可以确保止水坎位置及结构尺寸精度,且大大提高了止水坎台的防水能力,同时制作和安装效率高,提高工人的工作效率。
Construction process for water stop ridge below threshold stone
一种过门石下方止水坎施工工艺
CHEN YAWEI (Autor:in) / ZHOU TAO (Autor:in) / WU DI (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
Threshold structure with water stop ridge platform and construction method of threshold structure
Europäisches Patentamt | 2021
|Construction method for preposed prefabricated concrete water stop ridge
Europäisches Patentamt | 2023
|Construction method guaranteeing pouring formation of toilet water-stop ridge platform
Europäisches Patentamt | 2015
|