House change masonry construction process
The invention discloses a building construction process for house renovation, and relates to the technical field of building construction. In order to solve the problem of insufficient firmness of a wall body, the method specifically comprises the following steps that an original building is dismantled and reinforced based on design requirements; leveling an original building surface, and then snapping a line to determine the position of a door and window hole: determining the elevation of each floor on a brick foundation damp-proof layer or a floor, and determining the masonry position of each section of brick wall at the same elevation; the method comprises the following steps: fixing height poles for controlling the vertical size and perpendicularity accuracy of the masonry at four corners of a building, joints of inner and outer walls, staircases and positions with many holes; pre-inspection is conducted after the guide wall is manufactured; steel tie bar embedding and constructional column steel bar binding are conducted, specifically, steel tie bars are arranged along constructional columns, vertical drilling is conducted on constructional column lines, stirrups are planted, and the stirrups are bound; the row blocks are arranged at the bottom. The overall firmness of the wall body structure is improved, the situation of cracks or overall collapse caused by local collision of the wall body is avoided, and it is guaranteed that the wall body is evenly stressed and normally used in the later period.
本发明公开了一种房改砌筑施工工艺,涉及建筑施工技术领域。为了解决墙体牢固性不足的问题,具体包括以下步骤:基于设计要求对原建筑进行拆除和加固;在原建筑面找平,然后弹线确定门窗洞口位置:在砖基础防潮层或楼面上定出各楼层标高,确定各段砖墙在同一标高的砌筑位置;在建筑四大角、内外墙交接处、楼梯间以及洞口多的位置,固定用于控制砌体竖向尺寸和垂直度精确的皮数杆;做导墙后预检;预埋拉结钢筋、构造柱钢筋绑扎:拉结钢筋沿构造柱设置,对构造柱线进行上下钻孔植箍筋,并对箍筋进行绑扎;排块搁底。本发明提高墙体结构的整体牢固性,避免墙体局部受到撞击而出现的裂缝或整体坍塌情况,保证墙体受力均匀及后期的正常使用。
House change masonry construction process
The invention discloses a building construction process for house renovation, and relates to the technical field of building construction. In order to solve the problem of insufficient firmness of a wall body, the method specifically comprises the following steps that an original building is dismantled and reinforced based on design requirements; leveling an original building surface, and then snapping a line to determine the position of a door and window hole: determining the elevation of each floor on a brick foundation damp-proof layer or a floor, and determining the masonry position of each section of brick wall at the same elevation; the method comprises the following steps: fixing height poles for controlling the vertical size and perpendicularity accuracy of the masonry at four corners of a building, joints of inner and outer walls, staircases and positions with many holes; pre-inspection is conducted after the guide wall is manufactured; steel tie bar embedding and constructional column steel bar binding are conducted, specifically, steel tie bars are arranged along constructional columns, vertical drilling is conducted on constructional column lines, stirrups are planted, and the stirrups are bound; the row blocks are arranged at the bottom. The overall firmness of the wall body structure is improved, the situation of cracks or overall collapse caused by local collision of the wall body is avoided, and it is guaranteed that the wall body is evenly stressed and normally used in the later period.
本发明公开了一种房改砌筑施工工艺,涉及建筑施工技术领域。为了解决墙体牢固性不足的问题,具体包括以下步骤:基于设计要求对原建筑进行拆除和加固;在原建筑面找平,然后弹线确定门窗洞口位置:在砖基础防潮层或楼面上定出各楼层标高,确定各段砖墙在同一标高的砌筑位置;在建筑四大角、内外墙交接处、楼梯间以及洞口多的位置,固定用于控制砌体竖向尺寸和垂直度精确的皮数杆;做导墙后预检;预埋拉结钢筋、构造柱钢筋绑扎:拉结钢筋沿构造柱设置,对构造柱线进行上下钻孔植箍筋,并对箍筋进行绑扎;排块搁底。本发明提高墙体结构的整体牢固性,避免墙体局部受到撞击而出现的裂缝或整体坍塌情况,保证墙体受力均匀及后期的正常使用。
House change masonry construction process
一种房改砌筑施工工艺
QUAN QINGPENG (Autor:in) / WANG CHUANGYE (Autor:in) / MA XIAO (Autor:in) / ZHANG FUYING (Autor:in) / YANG RUIZENG (Autor:in) / PU YANG (Autor:in) / FENG SHENG (Autor:in) / SU ZIJIAN (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
Concrete masonry house construction
Engineering Index Backfile | 1924
Building masonry material and masonry construction process thereof
Europäisches Patentamt | 2023
|Masonry engineering construction device and construction process