Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underwater concrete pouring method for cast-in-place pile
The invention relates to an underwater concrete pouring method for a cast-in-place pile, which belongs to the technical field of building construction and comprises the following steps: S1, lowering a guide pipe, and mounting a hopper at one end of the guide pipe far away from the bottom of a hole; s2, pouring of the concrete foundation is conducted through a hopper, after pouring of the concrete foundation is completed, a small amount of concrete continues to be poured, and the thickness of the concrete foundation is increased; and S3, concrete pouring is conducted on the cast-in-place pile through the hopper till pouring of the cast-in-place pile is completed. The device has the effect of improving the pouring quality.
本申请涉及一种灌注桩水下混凝土浇筑方法,属于建筑施工的技术领域,其包括以下步骤:S1、下放导管,在远离孔底的导管一端安装料斗;S2、通过料斗进行混凝土基础的浇筑,在对混凝土基础浇筑完成时,继续浇筑少量混凝土,加高混凝土基础的厚度;S3、通过料斗对灌注桩进行混凝土浇筑,直至灌注桩浇筑完成。本申请具有提高浇筑质量的效果。
Underwater concrete pouring method for cast-in-place pile
The invention relates to an underwater concrete pouring method for a cast-in-place pile, which belongs to the technical field of building construction and comprises the following steps: S1, lowering a guide pipe, and mounting a hopper at one end of the guide pipe far away from the bottom of a hole; s2, pouring of the concrete foundation is conducted through a hopper, after pouring of the concrete foundation is completed, a small amount of concrete continues to be poured, and the thickness of the concrete foundation is increased; and S3, concrete pouring is conducted on the cast-in-place pile through the hopper till pouring of the cast-in-place pile is completed. The device has the effect of improving the pouring quality.
本申请涉及一种灌注桩水下混凝土浇筑方法,属于建筑施工的技术领域,其包括以下步骤:S1、下放导管,在远离孔底的导管一端安装料斗;S2、通过料斗进行混凝土基础的浇筑,在对混凝土基础浇筑完成时,继续浇筑少量混凝土,加高混凝土基础的厚度;S3、通过料斗对灌注桩进行混凝土浇筑,直至灌注桩浇筑完成。本申请具有提高浇筑质量的效果。
Underwater concrete pouring method for cast-in-place pile
一种灌注桩水下混凝土浇筑方法
LIANG JIANJUN (Autor:in) / RA JIN (Autor:in) / MAO YONGMING (Autor:in) / XU XUEZHENG (Autor:in) / MIAO LONGLONG (Autor:in) / LI ZHOUJIE (Autor:in) / ZANG JIANXIN (Autor:in) / SUN MENGMENG (Autor:in) / WANG JIYANG (Autor:in) / LIU TIEJUN (Autor:in)
09.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Underwater concrete pouring method for cast-in-place pile
Europäisches Patentamt | 2021
|Cast-in-place pile underwater concrete pouring elevation control instrument
Europäisches Patentamt | 2022
|Quality control method for underwater pouring concrete pile body of cast-in-place pile
Europäisches Patentamt | 2023
|Cast-in-place pile concrete pouring monitoring method
Europäisches Patentamt | 2023
|Cast-in-place concrete pile pouring device and pouring process
Europäisches Patentamt | 2023
|