Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention provides a beam pouring structure. The beam pouring structure comprises a first formwork, a second formwork, a third formwork, a fixing piece, a first connecting piece and a second connecting piece. And the second template and the first template are arranged in parallel. The third template is located on the side, facing the second template, of the first template. The fixing piece comprises a first supporting part, a second supporting part and a connecting part, the first supporting part extends in the height direction of the first formwork and is located on the side, back to the second formwork, of the first formwork, and the second supporting part extends in the height direction of the second formwork and is located on the side, back to the first formwork, of the second formwork. The two ends of the connecting part are connected to the top ends of the first supporting part and the second supporting part respectively. The first connecting piece is connected with the first supporting part, the first formwork and the third formwork. And the second connecting piece is used for fixing the connecting part and the tops of the first template and the second template so as to fix the relative position between the first template and the second template. According to the beam pouring structure, the formwork expansion phenomenon is avoided, and finally the beam pouring quality is improved.
本申请提供一种梁浇筑结构,包括第一模板、第二模板、第三模板、固定件、第一连接件及第二连接件。第二模板与第一模板相平行设置。第三模板位于第一模板朝向第二模板的一侧。固定件包括第一支撑部、第二支撑部及连接部,第一支撑部沿第一模板的高度方向延伸设置并位于第一模板背向第二模板的一侧,第二支撑部沿第二模板的高度方向延伸设置并位于第二模板背向第一模板的一侧,连接部的两端分别连接于第一支撑部及第二支撑部的顶端。第一连接件连接第一支撑部、第一模板及第三模板。第二连接件固定连接部与第一模板、第二模板的顶部,以固定第一模板与第二模板之间的相对位置。上述梁浇筑结构避免了涨模现象,最终提升了梁的浇筑质量。
The invention provides a beam pouring structure. The beam pouring structure comprises a first formwork, a second formwork, a third formwork, a fixing piece, a first connecting piece and a second connecting piece. And the second template and the first template are arranged in parallel. The third template is located on the side, facing the second template, of the first template. The fixing piece comprises a first supporting part, a second supporting part and a connecting part, the first supporting part extends in the height direction of the first formwork and is located on the side, back to the second formwork, of the first formwork, and the second supporting part extends in the height direction of the second formwork and is located on the side, back to the first formwork, of the second formwork. The two ends of the connecting part are connected to the top ends of the first supporting part and the second supporting part respectively. The first connecting piece is connected with the first supporting part, the first formwork and the third formwork. And the second connecting piece is used for fixing the connecting part and the tops of the first template and the second template so as to fix the relative position between the first template and the second template. According to the beam pouring structure, the formwork expansion phenomenon is avoided, and finally the beam pouring quality is improved.
本申请提供一种梁浇筑结构,包括第一模板、第二模板、第三模板、固定件、第一连接件及第二连接件。第二模板与第一模板相平行设置。第三模板位于第一模板朝向第二模板的一侧。固定件包括第一支撑部、第二支撑部及连接部,第一支撑部沿第一模板的高度方向延伸设置并位于第一模板背向第二模板的一侧,第二支撑部沿第二模板的高度方向延伸设置并位于第二模板背向第一模板的一侧,连接部的两端分别连接于第一支撑部及第二支撑部的顶端。第一连接件连接第一支撑部、第一模板及第三模板。第二连接件固定连接部与第一模板、第二模板的顶部,以固定第一模板与第二模板之间的相对位置。上述梁浇筑结构避免了涨模现象,最终提升了梁的浇筑质量。
Precast beam pouring installation auxiliary frame and precast beam pouring method
Europäisches Patentamt | 2023
|Bridge bearing platform straining beam pouring structure
Europäisches Patentamt | 2023
|