Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention provides a beam body pouring mold, and relates to the technical field of building construction, the beam body pouring mold comprises a bearing beam, the top of the bearing beam is provided with a pouring bearing wall, the two side edges of the pouring bearing wall are both provided with beam side plates, and the two beam side plates are oppositely arranged; supporting connecting pieces are installed on the outer sides of the side walls of the bearing beams, and connecting structures are arranged at the two ends of the beam body pouring mold. After being assembled, the whole beam body pouring mold is lifted through a lifting machine or a forklift or other tools and is connected with an external structure through a connecting structure, steel bars are erected between the two beam side plates, concrete is poured, and pouring of a beam body is achieved. The whole beam body pouring mold is arranged at a specific position after being assembled, on-site assembling at the high position of a construction site is not needed, and construction is convenient. When demolding is needed, the beam body pouring mold is lifted through a lifting machine or a forklift or other tools, the positioning assemblies and the beam side plates are detached, then the beam body pouring mold is detached from an external structure, and the lifting machine or the forklift drives the beam pouring mold to move downwards.
本发明提出了一种梁体浇筑模具,涉及建筑施工技术领域,包括承载梁,承载梁的顶部设置有浇筑承载壁,浇筑承载壁的两侧边沿均安装有梁侧板,两个梁侧板相对设置;承载梁的侧壁外侧安装有支撑连接件,梁体浇筑模具的两端均设置有连接结构。整个梁体浇筑模具组装后通过升降机或叉车等工具抬升,并通过连接结构与外部结构连接,通过在两个梁侧板之间架设钢筋并浇筑混凝土,实现梁体的浇筑。整个梁体浇筑模具组装后再布置到特定位置,无需在施工现场的高处进行现场散拼,方便施工。当需要脱模时,通过升降机或叉车等工具将梁体浇筑模具托举住,将定位组件与梁侧板拆卸,再将梁体浇筑模具与外部结构拆卸,升降机或叉车带动横梁浇筑模下移即可。
The invention provides a beam body pouring mold, and relates to the technical field of building construction, the beam body pouring mold comprises a bearing beam, the top of the bearing beam is provided with a pouring bearing wall, the two side edges of the pouring bearing wall are both provided with beam side plates, and the two beam side plates are oppositely arranged; supporting connecting pieces are installed on the outer sides of the side walls of the bearing beams, and connecting structures are arranged at the two ends of the beam body pouring mold. After being assembled, the whole beam body pouring mold is lifted through a lifting machine or a forklift or other tools and is connected with an external structure through a connecting structure, steel bars are erected between the two beam side plates, concrete is poured, and pouring of a beam body is achieved. The whole beam body pouring mold is arranged at a specific position after being assembled, on-site assembling at the high position of a construction site is not needed, and construction is convenient. When demolding is needed, the beam body pouring mold is lifted through a lifting machine or a forklift or other tools, the positioning assemblies and the beam side plates are detached, then the beam body pouring mold is detached from an external structure, and the lifting machine or the forklift drives the beam pouring mold to move downwards.
本发明提出了一种梁体浇筑模具,涉及建筑施工技术领域,包括承载梁,承载梁的顶部设置有浇筑承载壁,浇筑承载壁的两侧边沿均安装有梁侧板,两个梁侧板相对设置;承载梁的侧壁外侧安装有支撑连接件,梁体浇筑模具的两端均设置有连接结构。整个梁体浇筑模具组装后通过升降机或叉车等工具抬升,并通过连接结构与外部结构连接,通过在两个梁侧板之间架设钢筋并浇筑混凝土,实现梁体的浇筑。整个梁体浇筑模具组装后再布置到特定位置,无需在施工现场的高处进行现场散拼,方便施工。当需要脱模时,通过升降机或叉车等工具将梁体浇筑模具托举住,将定位组件与梁侧板拆卸,再将梁体浇筑模具与外部结构拆卸,升降机或叉车带动横梁浇筑模下移即可。
Beam body pouring mold
一种梁体浇筑模具
XU ZHENJIA (Autor:in)
30.09.2022
Patent
Elektronische Ressource
Chinesisch
Pouring mold for water-cooled beam stand column castable and construction method of pouring mold
Europäisches Patentamt | 2022
|Composite support mold body for large-span beam and slab concrete pouring construction
Europäisches Patentamt | 2024
|Prefabricated building cast-in-place pouring mold and pouring body and construction method thereof
Europäisches Patentamt | 2020
|