Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cable group synchronous tensioning device and construction method
The invention belongs to the technical field of building construction, and discloses a cable set synchronous tensioning device and a construction method.The cable set synchronous tensioning device comprises a tensioning tool, a first tensioning unit and a second tensioning unit, the tensioning tool is connected with a plurality of inhaul cables in a cable set, and a connecting lug plate on a main body structure is used for being connected with a cable head; the tensioning tool is located on the side, opposite to the connecting lug plate, of the cable head. The first tensioning unit comprises winding equipment, and the winding equipment is used for tensioning the cable group by winding and unwinding a steel wire rope; the second tensioning unit comprises bidirectional lifting equipment and telescopic adjusting equipment, the bidirectional lifting equipment is connected with the tensioning tool, the tensioning tool is provided with the adjusting equipment corresponding to each inhaul cable, and the telescopic end of the adjusting equipment is connected with the cable head. According to the cable group synchronous tensioning device and the construction method, synchronous tensioning in place of the cable group can be achieved, the tensioning work efficiency is improved, the cable length of each inhaul cable in the cable group can be rapidly and accurately adjusted, and it is guaranteed that the cable shape and the cable force of each inhaul cable in the cable group are consistent.
本发明属于建筑施工技术领域,公开一种索组同步张拉装置及施工方法,索组同步张拉装置包括张拉工装、第一张拉单元和第二张拉单元,张拉工装与索组中多根拉索连接,主体结构上的连接耳板用于与索头连接,张拉工装位于索头背向连接耳板的一侧;第一张拉单元包括卷绕设备,卷绕设备通过卷放钢丝绳以张拉索组;第二张拉单元包括双向提升设备和可伸缩的调节设备,双向提升设备与张拉工装连接,张拉工装上对应每个拉索均设置有一个调节设备,调节设备的伸缩端与索头连接。该索组同步张拉装置及施工方法,既能够实现索组同步张拉到位,提高张拉工效,又能够对索组内每根拉索的索长进行快速精调,保证索组内各拉索的索形和索力一致。
Cable group synchronous tensioning device and construction method
The invention belongs to the technical field of building construction, and discloses a cable set synchronous tensioning device and a construction method.The cable set synchronous tensioning device comprises a tensioning tool, a first tensioning unit and a second tensioning unit, the tensioning tool is connected with a plurality of inhaul cables in a cable set, and a connecting lug plate on a main body structure is used for being connected with a cable head; the tensioning tool is located on the side, opposite to the connecting lug plate, of the cable head. The first tensioning unit comprises winding equipment, and the winding equipment is used for tensioning the cable group by winding and unwinding a steel wire rope; the second tensioning unit comprises bidirectional lifting equipment and telescopic adjusting equipment, the bidirectional lifting equipment is connected with the tensioning tool, the tensioning tool is provided with the adjusting equipment corresponding to each inhaul cable, and the telescopic end of the adjusting equipment is connected with the cable head. According to the cable group synchronous tensioning device and the construction method, synchronous tensioning in place of the cable group can be achieved, the tensioning work efficiency is improved, the cable length of each inhaul cable in the cable group can be rapidly and accurately adjusted, and it is guaranteed that the cable shape and the cable force of each inhaul cable in the cable group are consistent.
本发明属于建筑施工技术领域,公开一种索组同步张拉装置及施工方法,索组同步张拉装置包括张拉工装、第一张拉单元和第二张拉单元,张拉工装与索组中多根拉索连接,主体结构上的连接耳板用于与索头连接,张拉工装位于索头背向连接耳板的一侧;第一张拉单元包括卷绕设备,卷绕设备通过卷放钢丝绳以张拉索组;第二张拉单元包括双向提升设备和可伸缩的调节设备,双向提升设备与张拉工装连接,张拉工装上对应每个拉索均设置有一个调节设备,调节设备的伸缩端与索头连接。该索组同步张拉装置及施工方法,既能够实现索组同步张拉到位,提高张拉工效,又能够对索组内每根拉索的索长进行快速精调,保证索组内各拉索的索形和索力一致。
Cable group synchronous tensioning device and construction method
索组同步张拉装置及施工方法
WU XIAOFENG (Autor:in) / YU AIYAN (Autor:in) / JIA BAORONG (Autor:in) / WANG ZHENGJIA (Autor:in) / LIU QUAN (Autor:in) / XU YONG (Autor:in) / SHEN ZHEQIAN (Autor:in) / XU YUNCHAO (Autor:in) / SHEN ZEXIN (Autor:in) / LIU WEI (Autor:in)
23.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2020
|Overall synchronous tensioning treatment method for cable-stayed bridge inhaul cable
Europäisches Patentamt | 2020
|On-site prestress tensioning method and tensioning device for super-large cable group
Europäisches Patentamt | 2024
|Tensioning device and tensioning method for stay cable
Europäisches Patentamt | 2024
|